高二英语单项选择题冲刺模拟练习内容摘要:

. • A. Viewing B. To view C. Viewed D. Having viewed him more time to think over the matter and you will get a satisfactory answer. • A. Leaving B. Left C. To leave D. Leave 74. The other day he hurried to school without breakfast, only ____ that it was Sunday. • A. to tell B. told C. to be told D. telling • 75. ____ from his excited voice, he must have some good news to tell me. • A. Judging B. Judged C. To judge D. Having judged • • 76. Once telling him the truth, ____. • A. he will be nervous all the time B. he will find himself nervous all the time • C. you will find him nervous all the time D. everyone will find him nervous • all the time 77. _____ wonderful, this kind of food enjoyed a good sale. • A. Tasted B. Being tasted C. Tasting D. Having tasted 78. Ding Junhui who has won many victories in his matches is considered ____. • A. achieving success B. to achieve success • C. having achieved success D. to have achieved success 79. Ann is fond of pop songs and is often ____ in her room. • A. listening to sing B. listened to sing C. listened to to sing D. listened to sing 80. While walking in the street, the girl felt a hand ____ into her pocket. • A. putting B. put C. to be putting D. to put • 81. While answering the phone, Ira noticed a fellow ____ her. • A. stare at B. stared at C. staring at D. to stare at 82. The thre。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。