高三英语非谓语动词专练内容摘要:
ed objections at the meeting. Well, now I regret ____ that. (NMET95 26) A. to do B. to be doing C. to have done D. having done 14. The boy wanted to ride his bicycle in the street, but his mother told him_____. (NMET95 35) A. not to B. not to do C. not do it D. do not to 15. She can’t help ____ the house because she’s busy making a cake. (97 上海 12) A. to clean B. cleaning C. cleaned D. being cleaned 16. She looks forward every spring to _____ the flowerlined garden (95 上海 20) A. visit B. paying a visit C. walk in D. walking in 18. The purpose of new technologies is to make life easier, ____ it more difficult. (NMET99 21) A. not make B. not to make C. not making D. do not make 17. While shopping, people sometime can’t help ____ into buying something they don’t really need. (96上海 14) A. to pursue B. persuading C. being persuaded D. be persuaded 20. When I got back home I saw a message。高三英语非谓语动词专练
相关推荐
于悟到了一个真理:欲无杂草,必须种上庄稼。 32 • 这个故事让人明白:欲无必有,欲有必无。 那么,要心中有真善美,必远离假恶丑。 这必须经过选择、鉴别和心灵的 巷战 ,才会让一个退出,另一个占据。 提示 无 与 有 是两个抽象的概念,材料中要 无草 ,则要 有庄稼 , 这是含义深刻的比喻,草喻生活中的假恶丑,庄稼喻真善美 ,此类题目审题时要注意 化抽象为具体 ,这样一来,思路就开阔了。
m,立杆间距为 ,大横杆平直搭设,符合技术要 求,横杆间距为。 双排间距为 ,内排钢管离墙 ,同步水平接头不超过 1 个,扣件中心到钢管外端不小于 10cm,满足各项安全技术规范要求。 外密目安全网及水平兜网挂设牢固、整齐、美观。 脚手架搭设应该按具体要求施工方案及技术交底实施,且应符合国家有关脚手架搭设要求。 四、 安全要求: 外架搭设具体技术要求按施工方案执行,并向操作人员做好书面交底工作。
合 的行文思路看出来了,把文章的 领起段、过渡段、中心段、归旨段、结语段 分辨清楚了,文章的脉络层次就在你眼前了。 [解题思路 ]分析结构、把握思路,都不是阅读的最终目的,而是为了更深入地理解文章的内容,提高阅读效率。 为此目的, 分析结构和把握思路,不能满足于辨别文章结构的形式和把握思路的走向,还要探究这样安排的原因或作者的意图。 [命题特点 ] 作者在文中的 观点态度 ,是文章思想内容的
I have neither brothers nor sistersin any other words, I am an only child. (NMET01) We may be one family and live under the same roof, but we do not seem to get much time to talk about together.
the world, with Canberra as its capital city. 2) It covers a total area of 7,686,850 square kilometers with a population of about 20 million. 3) It is a mainly dry country with only a few coastal