酒店管理会所8皇冠酒店设计标准手册建筑消防安全doc(最新整理内容摘要:

Illuminated exits signs with a secondary source of power placed so that the exit from the building is clearly marked 应妥善设置带有第二电源供电的发光出口标牌,以使建筑内的安全出口能够清楚地标示。 (h) Emergency lighting with a secondary source of power is to be provided in all exit paths, places of assembly, and in staff, plant and service areas 在所有出口通路、集散区域以及员工、设备服务区域, 都要求安装配有第二电源供电的应急灯。 (i) The above secondary source provides lighting (power) for at least 60 minutes 以上所述供应照明(电力)的第二电源,必须能够至少保持 60 分钟。 (j) Fire stairs exit outside the building or into an area protected by sprinklers, which leads to the building exterior 消防楼梯直接通向户外,或通向一个连接户外的,由喷淋设施保护的区域。 皇冠酒店设计标准手册 7 叶予舜 12/19/2020 7:32:55 PM (k) No bustible material installed/stored in exit stairs 逃生楼梯处 ,不得安装 / 储存可燃材料。 (l) Fire exit doors swing out in the direction of egress 安全逃生门,应该朝疏散方向向外开启。 (m) Any place of assembly for over 50 people has not less than 2 exits of appropriate size 任何一个超过 50 人的集散区域,至少要设置两个以上,大小合适的安全出口。 (n) Fire rating of 1hour is required if building structure (highest inhabitable floor level) is less than 25M above grade level or fire department access level 如若建筑结构(最高居住楼层)低于 25 米楼层或消防可至楼层,要求设有 1 小时防火等级。 (o) Fire rating of 2hours is required if building structure (highest inhabitable floor level) is more than 25M above grade level or fire department access level 如若建筑结构(最高居住楼层)超过 25 米楼层或消防可至楼层,要求设有 2 小时防火等级。 (p) Fire separation between guestrooms is 1 hour rated 客房之间防火阻隔的时间为 1 小时 (q) Fire separation between public areas, service areas and guestrooms is 1 hour rated 公共区域、服务区域和客房之间的防火阻隔时间为 1 小时 (r) Fire separation between different occupancies, . shops and public areas, is 1 hour rated 其他不同区域,如商店和公共区域,之间的防火阻隔时间为 1 小时。 (s) Smoke containment for service or other openings in walls, floors or between 皇冠酒店设计标准手册 8 叶予舜 12/19/2020 7:32:55 PM fire areas 墙面、地面的维修或其它开孔,或消防区域之间, 需设置烟雾阻隔措施。 (t) Minimum 20 minutes fire rated doors and frames for guestrooms 客房门及门框必须至少要有 20 分钟防火等级。 (u) All guestroom doors to be selfclosing and latching. No hold open mechanism allowed 所有客房门必须自动关闭并上锁。 不得使用机械装置维持其打开状态。 (v) All furnishings, textiles and finishes to be flame retardant 所有的家具、织物布料和饰面必须为阻燃材料。 (w) Sprinkler protection if building has floors more than 25M above grade level or fire department access level 如果建筑物有高于水平面及消防通道平面 25 米以上的楼层,则需安装消防喷淋保护设施。 (x) Wood frame construction buildings with two floors or more to be provided with sprinkler protection 两层楼以上的木框架建筑,必须安装消防喷淋保护设施。 (y) Automatic fire suppression system provided in all kitchen extraction hoods above cooking areas 所有厨房烹饪区上面的排烟罩,都必须设置自动灭火系统。 Windows and Balconies 窗及阳台 (a) Windows and doors opening onto to a balcony area must have an auxiliary locking device located out of the reach of children and restricting the initial opening of the window or door to 100mm 面朝露台区开启的窗和门,必须安装辅助锁装置,且安装于孩童不可触及的地方,并且皇冠酒店设计标准手册 9 叶予舜 12/19/2020 7:32:55 PM 开窗或开门的 初始宽 度限定为 100mm。 (b) Where auxil。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。