办公楼装饰装修工程施工合同中英文内容摘要:
k’s Delay 以下原因造成竣工日期拖延,经甲方代表确认后,工期才可相应顺延: Work’s period may be postponed provided that if the pletion day is delayed due to following reasons which have been confirmed by party A’s representative. ( 1) 甲方要求的设计及工程量重大变更; The design and work’s quantity, which are requested by party A have been material alteration. ( 2) 非乙方原因,一周内累计停水、停电八小时以上的; Disruption time of water and currency supply is more eight hours within one week due to non party B’s reason. ( 3)不可抗力,系 指战争和自然灾害; Force majeure shall refer to war and disasters. 除上述因素外,因乙方原因造成工程未按合同工期竣工的,由乙方承担违约责任,工期每延误一天 , 乙方支付违约金人民币 元。 Except to aforesaid reasons, provided that if failure of pletion as the schedule under contract due to party B’s reason, the responsibility thereof shall be on party B and party B should effect the payment of liquidated damages on RMB for each delayed day of work period. 第八条 工程验收 Project Acceptance 工程具备覆盖、掩盖条件以及进行隐蔽工程 之前,乙方应提前 1 天通知甲方检查,甲方在验收记录上签字后,方可进行隐蔽和继续施工。 否则甲方应当有权要求乙方拆除重建或者另行聘请第三方拆除重建,由此产生的一切费用和损失,包括工期延误的损失,由乙方承担。 Party B should, prior to the project with the conditions of cover and carrying out concealed work, 6 give one day advance notification to party A for inspection, and can not conduct the concealed work or continue execution until party A have signed on the acceptance record. Otherwise party A is entitle to require party B to dismantle and reconstruct or retain a third party to do the same, all expenses and losses consequent thereon or incidental thereto, including the loss of period delay, shall be assumed by party B. 甲方有权要求对工程进行分阶段验收,具体阶段性验收时间由甲方确定。 Party A has right to conduct the phased acceptance of project, respect to the time of particular acceptance, shall be subject to party A’s determination. 工程具备竣工验收条件,乙方应当向甲方提供完整竣工资料和竣工验收报告,甲方应在收到全部材料后 5日内组织验收,逾期视为甲方自动放弃权 利并视为验收合格。 如果工程符合第五条规定的质量标准,甲方应当签署验收报告。 如果工程不符合上述质量标准,乙方应当在甲方指出不符之处后立即组织修理或重建,并重新提供竣工资料和竣工验收报告。 由此产生的延误和损失,由乙方承担。 Party B should, upon project’s satisfaction of the acceptance conditions, submit the full set of pletion materials and report of acceptance。 and party A should, within five days upon receipt of all materials submitted by party B, anize the acceptance thereof, if, overdue time thereof, shall deemed as party A’s waiver of such right and deemed as qualification of acceptance. Where and to the extent that project satisfy the quality standards stipulated in Article Five hereof party A should make signature on the Acceptance Report。 where fail to conform to aforesaid standards, party B should, after party A ‘s indication of unconformities, forthwith conduct rectification or reconstruction and thereafter resubmit the pletion materials and acceptance report, any delay and loss occurred therefrom shall be undertaken by party B. 第九条 保修期限及范围 Warranty Period and Warranty Scope 保修期限 Warranty Period 乙方 对装修工程中的防水工程承担 5 年保修责任,粉刷承担 2 年的保修责任,其它部分按国家有关 建筑工程保修的 规定办理。 从甲方签署验收报告后起算。 Party B’s warranty responsibility of the waterproof engineering will be five years in addition to two years warranty for wall paintings, and other warranties will be subject to State’s regulations on construction warranty. The warranty period mence from the date on which party A sign Report of Acceptance. 保修范围: Warranty Scope 在保修期内,属乙方施工范围的工程项目,因施工质量及材料使用问题造成损坏损失的,乙方应免费维修和更换;若因甲方使用不当,造成的损坏,乙方只收取材料及人工成本费用。 如果保修期内装修工程出现任何质量问题,乙方应当自甲方提出 修理要求后 及时维修 ,维修费用由乙方承担。 两年之后,乙方继续为甲方服务可根据市场价格收取费用。 In the Warranty Period inspect to the project item which is belong to party B’s work scope, where whatever damage or loss occurred due to the execution quality and/or material use, party B should make repair and replace thereof。 where such damage due to party A’s improper use of project, party B only recover the fees of materials and labor. Party B should, where any quality defect of decoration in the Warranty Period, make repair in time on party A’s request thereof and undertaken 7 the cost therewith and party B shall, on and from two years thereafter, provide the continue service of repair and recover the cost on the market price. 第十条 违约责任 Breach Liability 如果 甲方代表不能及时给出必要指令、确认、批准,不按合同约定履行各项义务、支付工程款项及发生其它使合同无法履行的行为,甲方应承担违约责任,相应顺延工期。 Provided that the failure of party A’s representative to give the necessary direction, conformation and approval, to perform its various liabilities as per the stipulations hereof and failure to effect the payment of project cost, and/or conduct other acts which are make this contract unable to be fulfilled, party A should assume the breach liability consequent thereon or incidental thereto in addition to the corresponding postponement of work period. 乙方不能按合同工期竣工,施工质量达不到设计和规范的要求,或发生其它使合同无法履行的行为,乙方应承担违约责任,并按协议条款约定支付违约金,并赔偿因其违约给甲方造成的损失。 如果由于乙方的原因(包括但不限于设计缺陷及施工质量不符合本合同的要求)导致甲方的财产损失或人员伤亡,乙方将承担赔偿责任。 Provided that party B fails to make pletion as set in contract or its Work’s quality fail to satisfy the requirements of design and norms, or its other acts which make contract unable to be pe。办公楼装饰装修工程施工合同中英文
相关推荐
除本合同即视为乙方违约: ( 1)严重违反 行业管理规定及甲方公司管理规定的。 ( 2)发生重大服务质量事件,造成恶劣影响的。 ( 3)造成交通事故 3 次以 上 (含 3 次),负主要或主要以上责任,每次事故损失在 1 万 元以上的(以事故责任认定书上的总金额之和为准); ( 4)未经甲方允许,将车交于他人驾驶的; ( 5)被有关部门吊销《驾驶证》、《从业资格证》的; (
担任职位: 人事行政部经理 岗位类别: 人事经理 /主管 工作描述: 制订并推行的全面的人力资源管理。 **公司 ( 199607 ~ 202012) 公司性质: 外资企业 行业类别 : 其它生产、制造、加工 担任职位: 人事行政部经理 岗位类别: 人事经理 /主管【办公室主任求职简历模板】 工作描述: 主管行政人事工作。 离职 原因: 搬迁 **公司 ( 198810 ~ 199408)
申请人: 年年月日 12 / 30 社区 创业服务站 初审意见 经办人:年月日 街道 创业服务所 复审意 见见 复审人:年月日 区创 业业指导 服务中心 核实意 见见 核实人:年月日 市创 业业指导 服务中心 复核意 见见 复核人:年月日 市劳 动动就业 管理中心 审核意 见见 审核人:年月日 备注 ::此表一式两份;需提供相 关关材料:身份证、居民户口 簿簿、《就业失业登记证》、 营营业 执照
信息;l 收费管理员得到的信息;l 客户家居搬迁时提供的信息;l 客户(再次)装修时登记的信息;l 安全员的日常观察;l 警务工作站掌握的情况;,将客户及相关成员的资料内容填写于《业主资料卡》内,建立租户档案. 客服中心将建档的租户资料于当日下班前,录入《思源物业管理系统》客户管理模块. 客服中心根据输入的租户资料,利用报表管理模块打印报表,定期传递至指挥(监控)中心及安全组保存。
责任保证书等有关手续,并到学校保卫处登记备案。 学校保卫处、物业管理部门在检查中发现登记手续不全,违反《租赁房屋治安管理规定》及《租房须知》的,由公安机关进行处罚,因此造成的损失由个人和单位承担。 出租房屋的个人或单位必须按有关规定全面负责房屋出租后的日常管理。 四、房屋租赁给他人使用时,出租房屋的个人或单位,必须严格按照《租赁