供应商品质管理标准内容摘要:
tion to the requirements of ISO 9001, the Supplier shall implement a Supplier Management Plan for the control of its Suppliers. As a minimum, the Plan shall provide for quality goals, the performance of site surveys/audits, quality program requirements, change/revision control requirements, test/inspections, first article inspections and data package reviews. 除了 ISO9001的要求 ,供應商須導入供應商管理計劃以管控其供應商 .該計劃至少要求包括品質目標 ,現場調查 /稽核狀況 ,品質計劃要求 ,變更 /修訂 管控要求 ,測試 /檢驗 ,首件檢驗和資料的評審 . DEFINED QUALITY AND TECHNICAL REQUIREMENTS 定義品質和技術要求 The Supplier shall develop and implement a system that will provide for an effective process to define quality and technical requirements to their Suppliers. Quality and technical requirements are defined as quality programs, engineering drawings, specifications and functions to be performed by subtier Suppliers. The Supplier may elect to use a contract, purchase order or other suitable means in defining these requirements. However, MiTAC requires that quality and technical requirements are fully documented and that the Supplier verify understanding and implementation of such requirements. MITAC CONFIDENTIAL SUPPLIER MANAGEMENT QUALITY STANDARD QAP236B 9 供應商應開發並執行一系統 ,以提供有效的流程來定義對其供應商的品質和技術要求 .品質和技術要求包括品質計劃 ,工程圖紙 ,規格書和二階供應商的職責 .供應商可以選擇合同 , 採購合約或其他適當的方式來定義這些要求 .但是 ,MiTAC要求該品質和技術要求完全 文 檔化 ,且供應商理解並執行這些要求 ., SUBTIER SUPPLIER APPROVALS 二階供應商承認 The Supplier shall perform a quality review of its proposed Suppliers prior to the placement of purchasing documents and acceptance of parts/product. The approval of Suppliers shall be based on review of subtier Suppliers’ quality programs and ability to meet MiTAC expectations. Records of Supplier approval shall be maintained in a central location and made available for the MiTAC SQE to review upon request. 在採購和接受材料之前 ,供應商應對其供應商執行品質審核 .供應商的承認應基於二階供應商的品質計劃和滿足 MiTAC期望的能力 .供應商承認記錄應適當地保存維護並可便於 MiTAC SQE審核 . SUBTIER SUPPLIER AUDITS 二階供應商稽核 The Supplier shall implement a system to assure subtier Suppliers are audited periodically. The Supplier’s audit process should also provide for reassessments when quality levels drop below established quality goals or as warranted by the MiTAC SQE. In the event that a subtier Supplier is responsible for final production and packing of the product (subcontractor shipping directly to MiTAC on behalf of the Supplier), the Supplier shall facilitate access to these sites so that MiTAC may conduct audits as per Section of this document. 供應商應導入一系統 ,以保證定期稽核所有二階供應商 .當品質等級下降到低於定義的品質標準時或者MiTAC SQE 批准的目標 ,供應商的稽核流程應重新評估 .如果產品的最終生産和包裝由二階供應商負責(外包商代理供應商直接出貨給 MiTAC) ,供應商應該幫助 MiTAC到二階供應商工廠執行稽核 ,同此文件中 . FIRST ARTICLE INSPECTIONS 首件檢驗 The Supplier shall perform First Article Inspection on units from the first production run or for design changes that affect form, fit, or function. First Article Inspections shall be performed to verify builtasdesigned configuration and shall include 100% dimensional verification, electrical testing, raw material certification, and pliance with drawing notes. First Article data shall be maintained and submitted for the MiTAC CE to review upon request. 在量產前或會影響成型 ,適配和功能的設計變更之前 ,供應商應執行首件檢驗 .首件的執行應驗證設計的構造 ,且包括 100%尺寸確認 ,電性測試 ,原材料驗證及與圖紙的一致性 .首件數據應保存並在 MiTAC CE提出要求的情況下遞交給 MiTAC CE審核 . RECORDS 記錄 All records that provide evidence of Supplier activity such as Source Inspections and First Article Inspections shall be maintained in a central location and made available for the MiTAC SQE to review upon request. 所有供應商品質活動(如原材料檢驗和首件檢驗)的記錄都應該保存並在 MiTAC SQE提出要求的情況下 ,可供 MiTAC SQE審核 . MITAC CONFIDENTIAL SUPPLIER MANAGEMENT QUALITY STANDARD QAP236B 10 PRODUCT IDENTIFICATION AND LOT TRACEABILITY 產品標識和可追溯性 The Supplier shall establish and maintain procedures and processes for the identification and lot traceability of critical items during all stages of production, delivery, and installation. This is to be traceable through the finished product serial number or equivalent method. 供應商應建立並保持一流程和過程 ,以在生産 , 交貨 和安裝的所有過程中識別和追蹤關鍵項目 .可通過成品的序列號或其他方式進行追蹤 . PROCESS CONTROL 製程管控 The Supplier shall ensure that all manufacturing processes that affect the quality of a product are carried out in a controlled condition. MiTAC defines controlled conditions as: 供應商應保證所有會影響到產品質量的 生産流程處於控制狀態 .MiTAC所定義的管制狀態如下: Documented work instructions that provide clear and concise direction for the assembly, inspection, tests, and acceptance criteria of products. 文件化的作業指導書 ,以指導產品的封裝 ,檢驗 ,測試及允收標準 . Identification of critical parameters, implementation of statistical process controls, and initiation of corrective actions when necessary. Additionally, triggers shall be defined and documented for the purpose of initiating a stop build and/or stop shipment action. 關鍵參數的識別 ,統計過程式控制制的執行 ,必需改善措施的導入 .另外 ,須定義造成生産停綫 和停止出貨的標準並檔化 . Proofing out the manufacturing, inspection and test processes prior to mass production. 量產前核實生産 ,檢驗和測試流程 . Validation that manufacturing equipment (including fixtures) can produce a product meeting design intent and customer requirements. This should include formal gage repeatability and reproducibility (GRamp。 R) studies where appropriate. 生産設備(包括治具)的校驗 ,確保生産的產品滿足設計目的和客戶要求 .包括必要時的 Gage Ramp。 R分析 . Detailed workmanship criterion that stipulates the highest standard of quality. 詳細的作業標準以保證品質的最高水準 Preventive maintenance program for all equipment used in the manufacturing, inspection, and test of products. 用於產品的製造 , 檢驗和測試的所有設備的預防保養計劃 PROCESS QUALIFICATION 製程承認 All processes shall be qualified by MiTAC as outlined in the following paragraphs before mencement of volume production. The Supplier must obtain written approval from MiTAC prior to any change to a qualified manufacturing process o。供应商品质管理标准
相关推荐
发工程师、研发总监、厂部厂长及其相关人员。 异常分类: 外观不良:表面有划痕、水印、字体不清、表面气泡、砂眼、黑点、缺料、油污、毛刺、变形、色差、氧化及电镀层脱落、标识规格错误、无料号贴纸、无出厂检验报告等。 性能不良:尺寸与图纸不符、适配过大,过小、色温,波长,亮度不符、电压,电流不 中国 3000 万经理人首选培训网站 更多免费资料下载请进: 好好学习社区 符等。 异常处理方式
4. 未严格执行车辆出入管理,放行外来车辆,一经发现即作 “过错 ”处罚。 5. 未严格执行物资出入管理,造成公司损失,视情节轻重作 “过错 ”或开除处罚,并赔偿公司损失。 6. 未严格执行日常安全巡逻,视情节轻重作 “过错 ”或辞退处罚。 7. 未履行门卫岗位职责,作出有损公司形象的行为,视情节轻重作 “过错 ”或辞退处罚。 8. 未按要求执行门卫交接班,造成权责不清
图 29107 结算单详细信息 点击【确认】按钮将可以对该结算单进行确认,确认界面入图 29108 所示: 图 29108 结算单确认界面 在界面中输入确认意见后点击【提交】按钮,系统会自动更新确认日期和确认时间。 版权为原作者所有 点击结算单查询结果界面中任意一条结算单前的【条款明细】按钮,可以查看该结算单的条款详细信息。 如图 29109: 图 29109 单条结算单的条款详细信息界面
根据各车间的设备放置的具体情况,制定消防措施,制定紧急状态下的疏散方案。 5)接到火灾报警后,在向消防机关准确报警的同时,迅速奔赴现场,启用消防设施进行扑救,并协助消防部门查清火灾原因。 配齐灭火器、消防栓、消 防桶等消防器材,专人保管,定期检查,全体员工要爱护消防设施,禁止毁坏、偷盗消防设施,不能将消防设施挪作他用。 除发生事故外,任何人不得私自动用。 每季度对全体员工进行一次安全、防火教育课
[标签 :标题 ] 2020 计量数据进行人工采集,所记录的各项计量数据有原始的抄表记录、规范的电子文档。 原始记录数据真实、完整、准确,以保证统计报表信息能追溯到原始记录。 能做到生产运行、统计、财务报表中能源消耗计量数据真实、一致;实行能源计量数据统一归口管理,有专职人员对能源数据进行审核,利用计算机技术实行能源计量数据的网络化管理,按生产周期及时更新能源计量数据