最新酒店管理会所4皇冠酒店设计标准手册客房区域内容摘要:
19/2020 11:45:03 PM shall be the full width of the door frame. Carpettocarpet thresholds are not acceptable due to the automatic drop the threshold needs a ‘ hard surface’ to achieve the acoustic seal. 客房的进户门采用石材或木材门槛。 门槛应当与门框同宽。 由于下落式门封条,门槛需要有一个硬质表面,才能达到声音密封的效果,不得采用地毯接地毯的门槛。 ? Timber or stone thresholds, full width of door frames, are required at connecting doors. 在连通门处要求采用与门框等宽的木质或石质门槛。 ? Wood, marble, stone, or stainless steel strip thresholds shall be provided at transitions between hard flooring and carpeted areas. 在硬制地板和地毯区域 的过渡区域采用木制、大理石、石制或不锈钢条门槛。 (g) Hardware: 五金 Entry Doors to have: 进户门五金有: ? Heavy duty electronic card key locksets with lever handles and a deadbolt with a 25mm throw. All door locks shall be hotel mercial quality, or better. Refer to IHG HEOS Catalogue for current Remended Suppliers List for the electronic locksets. 重型电子钥匙卡装置,执手柄,以及一个防盗锁,锁舌的伸出长度不小于 25mm。 所有的 门锁都要求是酒店商业级品质,或更好等级的。 目前的电子锁供应商推荐列表,请参见洲际酒店集团的《酒店设备和运行服务目录》。 ? 11/2 pairs of hinges per door. Minimum 1 pair shall be spring hinges, or provide alternate closing device capable of closing and latching the entry door when released from any angle greater than 10 degrees. 每个门都要有 11/2对铰链。 至少有一对是弹簧铰链,或者采用其它的 闭门器 ,必须能够关闭任何大于 10度时放开的门。 皇冠酒店设计标准手册 9 叶予舜 12/19/2020 11:45:03 PM ? One door viewer (two at accessible guestrooms) with 180 degree viewing angle mounted at off . Refer to IHG HEOS Catalogue for current remended model and supplier. 安装一个 180度视角的猫眼(残障人房间要有两个),安装于距离地面装饰完成面 高的位置。 参见洲际酒店集团的《酒店设备和运行服务目录》中,目前所推荐的型号和供应商。 ? A night security bar with rubber bump (to prevent damage) and refer to IHG HEOS Catalogue for current remended model and supplier. 带有橡胶垫的晚间防盗链(以防损害),参见洲际酒店集团的《酒店设备和运行服务目 录》中,目前所推荐的型号和供应商。 ? A door stop. Wall mounted stop with blocking is preferred style and finish to pliment interior design scheme. 一个门碰。 最好是固定于墙上的带有固定锚固块的门碰,饰面与室 内设计方案相符。 ? All door hardware shall have finish to pliment interior design scheme. 所有的门五金饰面都必须与室内设计方案相符合。 Connecting Doors to have: 连通门五金有: ? Passage sets with lever handles shall be provided on the guestroom side only of each door leaf. 只在门扇的客房一侧,安装有门执手。 ? 11/2 pairs of hinges on each door. 每扇门上要有 11/2 对铰链。 ? Mortise thumb turn dead bolt with a minimum of 25mm throw for each door. Provide a visible mean to determine if the dead bolt is in the locked or unlocked position. 每扇门上要安装无弹簧防盗锁,锁舌的伸入榫眼的长度不小于 25mm。 设置一个标志,以 皇冠酒店设计标准手册 10 叶予舜 12/19/2020 11:45:03 PM 便判断防盗锁处于开或锁的位置。 ? Door stops. Wall mounted stop with blocking is required. 安装门碰。 要求是安装于墙上带有固定锚固块的门碰。 ? Perimeter sound seals to sides and head of both doors. 每扇门的顶和两侧,都要安装隔音封边条。 ? Automatic drop down seal over threshold at one door. 在一扇门上装有落到门槛上的下落式门封条。 ? All door hardware shall have a finish to pliment interior design scheme. 所有的门五金饰面都必须与室内设计方案相符合。 (h) Lighting 照明灯具 Type: 类型 ? Lighting for guestrooms should be in accordance with the Lighting Designers Concept, using a bination of recessed down lights, decorative bedside / standard lamps, specific task lighting on / over desk and over bed for reading. 客房内的照明灯具要求应符合照明设计师的设计理念,综合采用嵌入式筒灯、床边装饰灯 / 标准台灯、书桌工作和床头阅读专用灯。 ? Lamps should use warm white bulbs throughout the guestroom, including desk lamps, bedside table lamps and reading lamps. 整个客房的照明灯具,包括书桌灯、床边灯和阅读灯,都必须采用暖白色灯泡。 ? The entry foyer shall have a recessed ceiling fixture/s with pact fluorescent warm white bulb. 入口门廊要设有天花嵌入式灯具,配以暖白色节能荧光灯泡。 ? The Closet shall have strip fluorescent lamps (warm white) concealed behind 皇冠酒店设计标准手册 11 叶予舜 12/19/2020 11:45:03 PM the slatted shelf downturn or ‘ frontskirt’ to provide light downwards onto the hanging clothes and upwards into the closet ‘ hatshelf’ area. 壁橱板条架的下面或前沿,安装一个暗藏(暖白色)条形荧光灯,从上而下照亮壁橱内所挂衣服,以及从下而上照亮壁橱内的帽架区域。 ? Lighting design for guestrooms will be remended by Lighting Consultant and shall ply with all applicable national and local energy codes. 客房的照明设计将由照明顾问提供,并且要符合所有适用的国家和地方能源规定。 Level:照明亮度 ? Refer to IHG Engineering Standards Manual 2020, Section – Electrical. 参见《 IHG工程标准手册 2020》,第 —— 电气。 (i)。最新酒店管理会所4皇冠酒店设计标准手册客房区域
相关推荐
部门 检定周期 检定结 果 有效期至 1 2 3 4 5 6 7 8 9 10 11 12 13 14 计量器具送检计划表 部门:。
2 全面质量管理优秀成果 的 申报 和评审 3 国家级工程质量奖的 申报 和评审 4 工程质量投诉管理 14 5 重大工程质量事故的调查和处理 七、检查资料 1 工程质量管理情况报告 2 考核评价报告 3 工程质量检查结果通报 4 复查情况报告 5 全面质量管理 QC 成果报告 6 优秀质量管理小组成果评审报告 7 本年度拟推荐参加国家级工程奖的项目情况评估报告 8 工程质量投诉书 9
6 C 11 原子吸收仪 产品质量检验 12 C 12 X萤光分析仪 产品质量检验 12 C 13 红外 联测仪 产品质量检验 12 C 14 CO、 O2分析仪 工艺监控 C 15 光谱仪 产品质量检验 12 C 16 水份测定仪 产品质量检验 12 C 17 定氢仪 产品质量检验 12 C 18 氮、氧联检仪 产品质量检验 12 C 19 电导 率仪 校验试验 12 C 20 在线余氯分析仪
项目核准 —— 项目单位在获得环评审批文件后,向项目核准机关报送项目申请报告,并附土地中标通知书(或者成交确认书、土地 出让合同)、办理审批等文件。 核准后,项目单位凭核准文件分别向规划管理部门申请办理设计方案、建设用地规划许可等手续;向房地管理部门申请办理正式 用地手续;向建设交通管理部门申请办理建设工程报建手续。 4. 设计方案审批 —— 项目单位按照出让合同的要求
括:控股层企业、参股层企业和协作层企业;第三层次企业是一级子公司、关联公司、再投资设立的二级子公司、关联公司组成。 绝对控股:持股比例超过 50%; 相对控股:指投资企业中为最大的股东,一般持股比例超过 30% 协作企业之间非产权关系。 二 、企业联合的形式: 卡特尔 即生产同类产品的企业在划分销售市场、制定商品价格等方面通过协议而形成的契约式垄断销售联合体 辛迪加
就需要选择不同的实例名称了。 建议将实例名限制在 10 个字符之内。 实例名会出现在各种 SQL Server 和系统工具的用户界面中,因此,名称越短越容易读取。 另外,实例名称不能是 Default 或 MSSQLServer 以及 SQL Server 的保留关键字等。 图 6 在 安装类型 窗口,选择 典型 安装选项,并指定 目的文件夹。 程序和数据文件的默认安装位置都是 C