高考英语虚拟语气及虚拟语气练习二内容摘要:
at once. A. would started be started started D. should be started 55. It is strange that such a thing ___ in your school. A. will happen B. happens C. should happen D. happened 56. It is imperative that you ___ on time. A. are B. will be C. be D. would be 57. I didn’t go to the party, but I do wish I ___ there. A. was B. were C. had been D. went 58. It is time we ___ up our results. A. sum B. summed C. will sum D. would sum 59. If the doctor had been available, the child ___. A. would not die B. would not have died C. could not die D. could not have died 60. Dr. Bethune worked hard as if he ___. A. never had felt tired B. had never felt tired C. never felt tired D. was tired never 61. I enjoyed the movie very much. I wish I ___ the book from which it was made. A. have read B. had read C. should have read D. am reading 62. You are late. If you ___ a few minutes earlier, you ___ him. A. came/ would meet B. had e/ would have met C. e/ will meet D. had e/ would met 63. I wish my husband ___ as well as yours. A. had dressed B. dress C. will dress D. dressed 64. Edison kept phosphorus carefully in a bottle lest it ___. A. would burn B. burned C. was burning D. should burn 65. He looked as if he ___ ill for a long time. A. was B. were C. has been D. had been 66. If the doctor had e earlier, the poor child ___. A. would not have been lied there for two hours B. would not have laid there for two hours C. would not have lied there for two hours D. would not have lain there for two hours 67. I wish that I ___ with you last night. A. went B. could go C. have gone D. could have gone 68. Let39。 s say you could go there again, how ___ feel? A. will you B. should you C. would you D. do you 69. Mr. Brown left for London long ago. That39。 s a pity. I wish ___. A. I meet him. B. I39。 ll have met him C. I had met him D. I39。 d meet him 70. I can39。 t stand him. He always talks as though he ___ everything. A. knew B. knows C. has known D. had known 71. I wish I ___. A. will tell him that B. didn39。 t tell him that C. told him not that D. had not told him that 72. If you had told me in advance, I ___ him at the airport. A. would meet B. would had meet C. would have met D. would have meet 73. Kunar can take his car apart and put it back together again. I certainly wish he ___ me how. A. teaches B. will teach C. has taught D. would teach 74. I would have told him the answer had it been possible but I ___ so busy then. A. had been B. were C. was D. would be 75. I wish I ___ able to tell him all about it last night. A. should be B. were C. had been D. was 76. If it ___ another ten minutes, the game would have been called off. A. had rained B. would had rained C. have seen D. did see 77. He suggested that they ___ use a trick instead of fighting. A. should B. would C. do D. had 78. My father did not go to New York。 the doctor suggested that he ___ there. A. not went B. won39。 t go C. not go D. not to go 79. I would have gone to the meeting if I ___。高考英语虚拟语气及虚拟语气练习二
相关推荐
as very sad over the loss of the photos she had shot at Canada, this was a memory she especially treasured. ( 06 广东) A. as B. if C. when D. where 50. You can39。 t have this football back you promise
支付。 1022 施工环保费:按按招标文件及《公路工程国内招标文件范本》中有关规定执行。 临时工程 : 按公路工程国内招标文件范本规定支付。 1081 安全生产费 : 经业主或总监办指定或批准, 按实际发生计量,报价总额控制。 第 200 章 土石方工程 按招标文件 及《公路工程国内招标文件范本》中 有关各章节执行。 路基土石方 计量以每公里为一控制段,在填写中间计量表时,原则不应跨越公里填写
粉甲虫当遇到过多仔鱼或卵时,就把它吃掉 D 草食动物胃中的细菌和原生动物 AC 15. 在一个随机交配的果蝇群体中 ,4%的果蝇为黑身 (b 隐性基因决定 ),96%的果蝇为灰身 (B显性基因决定 ).在这个种群中 ,BB 与 Bb 个体依次是 ______%和 ______% 根据在一个随机交配的果蝇群体中 ,4%的果蝇为黑身 (b 隐性基因决定 ),bb 的基因型频率为4/100,则 b
( B)四面体的斜高 ( C)四面体的高 ( D)四面体两对棱间的距离 过定点 (1, 3)可作两条直线与圆 x2+ y2+ 2kx+ 2y+ k2- 24=0 相切, 第 2 页 共 3 页 则 k 的取值范围是( )。 ( A) k2 ( B) k- 4 ( C) k2 或 k- 4 ( D)- 4k2 设 a, b 是满足 ab0 的实数,那么( )。 ( A) |a+ b||a- b|
___________ 4. Acceptable price: _________________ 5. Facilities (便利条件 ): ______________________________________________ Passage 4 There was once a man in South America who had a parrot, a pet bird