数据库信息管理系统简介毕业论文外文翻译内容摘要:

r puterbased, independent or integrated, batch or online. The information system is usually the various types of bination. That is, of course, it can not be independent and is integrated. Independent system to meet a specific application area (for example, personnel management) design. Independent system with its own documents, which are inevitable with a certain degree of redundancy. Integrated information systems through their use of the data were bined. Resource sharing system using a database to achieve integrated objectives. For example, the normal wage system requirements from the human resources and accounting systems found in the data. Artificial system has been developed based on a variety of puter information systems. So far, in a puterized artificial, and still lacks design experience (or) lack of information between users and service personnel exchanges. That is to say, puterbased workflow system directly from the manual system workflow. Often, these systems are independent, and the puter just as a data processor. In the design of these systems, with little regard to their integrated to the end of intent. Information systems according to a batch, online processing or both bination classification. In a batch system and data will be handled in batches or reports. For example, banks will be a large number of cheque code, and then the end of the。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。