外贸合同样本-英文版内容摘要:

na). 4. INSURANCE Insurance up to the point of delivery shall be the responsibility of the SELLER. Insurance after the point of delivery shall be the responsibility of the BUYER. 5. PLACE OF SHIPMENT ********* 6. PLACE OF DELIVERY ************* 7. SHIPMENT *************************** PURCHASE AND SALE CONTRACT. NO.: *************. 3/5 3 The shipment will be effected before ******* 8. PACKAGING 1MT bags sealed in container The goods should be packed suitable for long distance land transportation and for change of climate, well protected against moisture and shocks. 9. SHIPPING MARKS N/M 10. QUALITY AND WEIGHT INSPECTION At the place of shipment (Mongolia), weighing, sampling and analysis shall be carried out by CGL in accordance with standard international practice. Inspection fee shall be for the SELLER’s account. The BUYER has the right to be present or represented at these operations at it39。 s own expense. At the discharging place (China), weighting, sampling analysis shall be carried out by CIQ/CCIC at BUYER39。 s account in accordance with international practices. Inspection fee shall be for the BUYER’s account. The SELLER has the right to be present or represented at these operations at it39。 s own expense. The certificate issued by CIQ/CCIC shall be the final results for negotiation of payment. 11. TERM OF PAYMENT ************* 12. REQUIR。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。