英文简历土木工程专业内容摘要:

s of materials, and estimates for UNHCR building. June 1998September 1998 KONOIKE CONSTRUCTION COMPANY, Tanzania Civil Engineer Trainee (Internship) Assisted in the supervision of road work, which include material and work scheduling, setting out of roadway alignment, structural concrete and pavement works. TEACHING EXPERIENCE Florida State University, Traffic Engineering Lab, Tallahassee, FL, 2020 to date Teaching Assistant to Dr. Renatus Mussa. Assisted in preparation of the course notes, homework, term design projects, tutoring students Causes assisted: TTE 3004Transportation Engineering, TTE5305Traffic Engineering, TTE 5805Highway Geometric Design, TTE 5256Traffic Operations RELEVANT TRANSPORTATION PROJECTS: • Evaluation of the relevance of minimum speed limit on Interstate highways in Florida (202004) • Geometric design of Orange Avenue Extension(2020) • Geometric design of Blair Stone NE extension. (2020) • Operational and safety evaluation of Tennessee/Capital Circle Intersection (2020) • Operational and safety evaluation of Railroad/ Gaines Intersection(2020) • Corridor analysis of Gaines street (2020) • Traffic warranty study at Bellevue/Lipona Intersection(2020) COMPUTER SKILLS Statistical Packages: SAS, STATA, SPlus Traffic Simulation Packages: SYNCHRO PRO, CORSIM, HCS, VISSIM, TRANSYT 7F GIS Packages: ArcView, ArcGIS CAD Packages: AutoCAD, Microstation Highway Design Packages: Autodesk Land Desktop Development, Eagle Point, Inroads/GEOPAK. Urban Transportation Modeling Packages: Cube Voyager Data Management Packages: MS ACCESS, MS EXCEL Programming Languages: C++, Java, Paschal, Prolog, Matlab, SQL, HTML Other Applications packages: MS office XP, Macromedia, Lindo, MS Project, MS Publis。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。