[经济管理]酒店管理会所1皇冠酒店设计标准手册介绍内容摘要:
criteria in the building architectural planning to ply with the Global IHG Fire Protection and Life Safety Design. 此部分概述了符合全球 IHG消防安全设计建筑规划标准。 Section 9: Finishes, Materials, Fittings and Hardware 第九部分:饰面、材料、装饰件和五金 This section describes the definition of finishes and fittings, the remended general finishes for each application and location in the hotel, installation methods, and special fittings and equipment requirements for all functional uses of the public areas, guestrooms and BOH areas. 此部分描述了各种饰面和装饰件定义,酒店各部分所应安装 的饰面,安装方法和公共区域、客房和后场区域的所有功能使用的特殊装饰件以及设备要求 Section 10: Key Standards Summary 第十部分:主要标准概要 This useful section summarises in easy reference table format, some of the ‘ keydesign’ criteria essentials in good hotel design such as guestroom module gross / m178。 area calculation methods, fire ratings between all vertical / horizontal partments / partitions / walls, minimum public area and BOH ceiling heights, acoustic ratings and lighting levels to name a few. 这一部分采用方便查询的表格,总结了一些优质酒店‚关键设计‛的标准和要素,比如客房模块建筑总面积 /净面 积 m178。 的计算方法、所有垂直 /水平隔间 /隔墙之间的防火等级、公共区域和后场的最低天花高度、噪音指数和照明等级等。 The Design Standards Manual for the Crowne Plaza Hotel Brand is only one of ten 皇冠酒店设计标准手册 12 叶予舜 12/20/2020 11:24:27 PM (10) IHG Standards to be used in the various design, mockup room and construction stages of a Crowne Plaza Development. 设计标准手册仅是 IHG 皇冠酒店品牌的十大标准之一,用于皇冠酒店的各个设计、样板间和施工阶段 These documents will be handed over in a progressive manner during the initial Project Phases – Design Brief Phase (DB), Concept Design Phase (CD) and Design Development Phase (DD).These ten (10) Standards are as follows: 这些文件将会在项目初始阶段 设计概要阶段( DB)、概念设计阶段( CD)和设计深化阶段 ( DD)逐步进行移交。 以下为十大标准: 1. Design Standards Manual: 设计标准手册 This document establishes the minimum architectural and interior, design criteria for construction,renovation or conversion of Crowne Plaza Hotel properties. 该文件定义了皇冠酒店施工、翻新和改建的建筑和室内设计标准的最低要求。 2. Facilities amp。 Area Design Program: 设施和区域设计方案 This document gives a full breakup in m178。 of each。 guestroom, public, BOH, circulation area of the hotel, including departmental relationships, circulation flow and general planning notes. 该文件将酒店的客房、公共区域、后场、通道区域,按平方米详细分析,包括了各部门关系、客流量和规划备注。 3. Food amp。 Beverage: Restaurant, Bar Banqueting Concepts: 餐饮:餐厅、酒吧宴会概念 皇冠酒店设计标准手册 13 叶予舜 12/20/2020 11:24:27 PM This document describes the design and operational concepts of each outlet in terms of。 ambience, theme, remended table sizes, table mix, food concept, uniform style and table top brief, including visual reference material. 该文件为每个餐饮区描述了周围环境、主题氛围、所建议的桌子尺寸、桌子摆放、食品主题、员工制服样式以及餐桌桌面式样,包括参考图片材料等各个方面的设计和运营理念。 4. Spa and Fitness Centre Design Manuals: Spa和健身中心设计手册 This document describes the design and operational concepts of the Spa and Fitness Centre in terms of ‘ sensory journey’ , spa / fitness centre experience and facilities to be provided, ambience, theme, remended treatment rooms and locker room layouts, food concept, uniform style, lighting amp。 HVAC brief, including visual reference material. 该文件描述了 Spa和健身中心所提倡的‘感觉之旅’,所提供的 Spa/健身体验和设施、周围环境、主题气氛、所建议的治疗室和更衣室布置,食品概念、制服样式、照明及空调,包括参考图片材料等各个方面的设计、运营理念。 5. Supplementary Design Reference: 补充设计参考 These ‘ user friendly’ Design Reference, outline Guestroom Electrical and Circuitry Layouts, Shower Door Threshold Details, Front Desk Design for Reception, Concierge Stations and Club Lounge, Meeting Rooms, Club Lounge, Generic Planning for FOH amp。 BOH Areas, FFE for General Offices amp。 BOH, Mamp。 E Requirements for General Offices amp。 BOH, Finishes Schedule for General Offices amp。 BOH, Staff Dining Room Sample Design, Staff Changing Facilities Sample Design / Generic Planning for Executive Office, Accounts Office, Front Office, Safe Deposit Box, HR, Engineering, IT amp。 PABX, IT Design Manual and generic layouts, Communications Centre and generic layouts. 皇冠酒店设计标准手册 14 叶予舜 12/20/2020 11:24:27 PM 这个使用方便的设计参考,概括了客房电器和电路布置、淋浴房门节点详图、大堂接待处的前台设计、礼宾部及其俱乐部酒廊、会议室、俱乐部酒廊,以及前后场区域总平面布置、办公区和后场家具布置、办公区和后场机电要求、办公区和后场装饰材料表、员工餐厅设计样板、员工更衣室设计样板 /行政办公室总平面布置、财务办公室、前台办公室、保险箱房间、人力资源部、工程部、 IT及电话总机、 IT设计手册和总布置、通信中心及其总布置。 6. Engineering Standards Manual: 工程标准手册 These standards establish the minimum requirements for hotel FLS and MEP Systems throughout the hotel. 这些标准设定了整个酒店 FLS(消防安全)和 MEP(机电系统)的最低设计要求。 7. Technical Services Procedures: 技术服务程序 This Manual describes the Organisational Structure of a typical project and the Consultants required, Consultants Scope of Work, the role of IHG Technical Services, Owners and Consultants responsibilities and deliverables, TS Approval Process, Project Delivery Process and Handover Process. 此手册描述了标准项目的组织架构、所要求的顾问以及顾问工作范围、 IHG技术服务的职能、业主和顾问的相应职责及需要准备递送的文件、技术服务审批程序和项目移交程序。 8. Worldwide Signage Guidelines: 全球性标牌设计 This document establishes the rules for use of the Crowne Plaza Brand Logo, Brand Identity, exterior and interior signage systems amp。 programs including the gateway, high level, mid level, low level entrance all internal / external directional, information and statutory signage and Famp。 B, Function spaces identification graphics. 本文件设定了皇冠酒店标志 Logo的使用规则、品牌定义、室外和室内标志体系和程序,皇冠酒店设计标准手册 15 叶予舜 12/20/2020 11:24:27 PM 其中包括入口、所有高、中低处入口室内 /室外指示牌、信息及规定指示牌,以及餐饮、功能区的识别图形。 9. PreOpening Handover Schedule: 试营业移交进度 This schedule identifies the sequence and areas of the hotel to be handed over to IHG PreOpening Team. This handover schedule identifies the anticipated practical pletion date, period for defect rectification and hand over certain areas to the IHG preopening team for staff training / puter, PABX, POS systems missioning. 本进度表确定了酒店移交给 IHG试营业团队的顺序和区域。 这一移交程序确定了预期实际竣工日期、缺陷整改和移交特定区域时段,以便 IHG试营业团队进行员工培训 /电脑、电话交换设施、 POS机系统运行调试。 10. Crowne Plaza Service Standards: 皇冠酒店服务标准 These many standards only availab。[经济管理]酒店管理会所1皇冠酒店设计标准手册介绍
相关推荐
发现问题必须立即整改,重大异常必须立即上报超市事业部。 ( 2) 每日巡查必须有文字记录并有相关人员的签字确认以备超市事业部督促凭证。 储存管理 ( 1)各部门所有人应当按照保证商品安全的要求储存商品(特别是食品类商品),定期检查库存商品,及时清理临期和过期商品; ( 2)库房存放的商品必须在醒目的位置标注明商品的条码、品名及商品到期日期,商品出库时应严格遵循“先进先出”原则。 销售管理 (
心 仓储管理员、 车辆调度员、物流、信息操作员、客户管理管理员 物流中心仓储主管、运输主管、配送部主管 其他 企业 货代公司货代员、快递公司仓储员、客服人员、信息处理员等 (三) 岗位 典型工作任务 及职业能力 分析 物流管理专业典型工作任务 及其工作过程 见表 5。 表 5 物流管理专业典型工作任务 及其工作过程 典型工作任务 工作过程 市场拓展 了解客户基本物流信息→谈判→成本核算→方案设计
一、公司简单描述 4 二、公司宗旨和目标 4 三、公司目前主要业务介绍 4 四、投入的资金及用途 5 五、公司目前的股权结构 5 六、市场概况和营销策略 5 七、业务部门身冒呜悄买矾招蝶饯手膳氰漱川 竟忱昼逛皱箕恤与茁芬囚始熙筛瑰拈孟背橡烦 菏字芜捂碾虾胸锰入痞待梅感木裔艾服喊应弄 掉紊址拄爸驱划不砧扛 二、资金使用 36 非常酷健康管理有限公司创业计划书非常酷健 康管理有限公司 1 目
获得周期、数据标准、实现点检制度的八定 设备状态:设备处于不同的状态相应的点检项目内容不同 数据类型:抄表类、测量类、标准观察类、非标准观察类、设备状态类。 建立完整的设备编码体系。 ( 2) 点巡检 标准 数据流程 : 数据获得方法 设备状态 数据标准 项目周期标准 岗位或专业 区域 设备 部件 点检项目 点巡检标准 数据流程 观察 测量 抄表 在线系统 红外发射率 同步频谱菜样 第
识产权的有关工作进行备案,主要包括:高新技术的科研独立开发、合作开发、知识产权合同;知识产权转让合同;知识产权评估;涉及知识产权的企业批准文件;知识产权成果处理方案;知识产权 纠纷处理方案;知识产权会议的决议;知识产权中涉密范围人员名单;商业秘密保护范围划定;商业秘密保护措施;知识产权保护承诺书及相关的劳动合同;有关的知识产权规定;知识产权的财务处理等相关资料报 信息中心 备案。 第 九 条
因,作出处理。 财务工作人员对上述事项无权自行作出处理。 第十六条 财务工作应当建立内部稽核制度,并做好内部审计。 出纳人员不得兼管稽核、会计档案保管和收入、费用、债权和债务账目的登记工作。 第十七条 财务审计每季一次。 审计人员根据审计事项实行审计,并作出审计报告,报送总经理。 第十八条 财务工作人员调动工作或者离职,必须与接管人员办清交接手续。 财务工作人员办理交接手续,由总经理办公室主任