通信电子]基于gprs远程监控系统数据终端的研究外文资料翻译内容摘要:
cket switching technology, patible with GSM, and highspeed data transmission works, GPRS in the GSM work to introduce a traditional three new ponents : PCU (Packet Control Unit, a control unit). SGSN (Serving GPRS Support Node. GPRS service node support) and GGSN (Gateway GPRS Support Node. Gateway GPRS support node) with the following characteristics : The high utilization rate of resources to the introduction of the GPRS packet switching mode of transmission, Only users send or receive data only during the occupation of resources This means that many users share the same wireless munications and high efficiency, thereby increasing the utilization of resources. GSM circuit switched data transmission methods and models for the entire link period, Whether users transmit data alone will occupy Channel. GPRS Billing users by the flow of data munications for the accounting standards. GPRS data transmission speed of highspeed transmission attainable Access to wait for a short time GPRS access time is short, fast connectivity, the average 2s. Online users will provide realtime line and online at the initial state, which will visit service is very simple and rapid. GPRS supports IP and support of the most widely used Inter IP and X . 25 agreement, but because of GSM work coverage, makes GPRS will provide Inter and other wireless access to a global work. GPRS features can be seen from the above, the GPRS work is particularly suited to the frequent smallvolume data transmission. Industry Remote Data Acquisition System is a relatively small volume of data typical of the realtime frequency transmission system. 3 System Design system structure Overall system structure like chart 1 shows. Serial or user terminal equipment to connect to GPRS wireless data terminals, and then labeled as IP packet data. GPRS air interface to access through GPRS work Gateway Routing and eventually arrived at through various data centers. terminals hardware design Data Terminal Equipment GPRS Data Terminal Inter GPRS work Data Center Equipment System structure GPRS data terminal hardware modular design, include the dataprocessing module, remote munication module. analogdigital conversion module and display module, the system structure is shown in figure 2. Data processing module contains AT89C55[3], X25045 two chips, AT89C55 for dealing with longrange munication modules, analog / digital converter module and the module data transmission. To ensure that data will not be lost restart. Serial E2PROM X25045 device us。通信电子]基于gprs远程监控系统数据终端的研究外文资料翻译
相关推荐
案 东方山鼎新能源 东方山鼎 风光互补供电系统 利用 先进的太阳能方阵和 风 力发电 机 控制技术 ,通过 智能控制柜 将 太阳能电池组件产生的直流电 与风力发电机组 产生 的交流电整流 ,然后一部分转化成交流电供负载使用,另一部分将电能存储到蓄电池组中。 当阳光或风能不足时 , 蓄电池的电能通过 控制柜的智能管理 转化 为交流电供负载使用。 当蓄电池的容量不足以给负载供电时,则 由智能控制柜
(制造入侵障碍)、报警(声、光报警并可与其它安防系统联动)三重功能。 克服了交流电网致命、影响美观的缺点,与传统的红外、微波、 静电感应等周界安防系统相比,具有误报率低、不受地形和环境限制、安全性高等明显优点,已被广泛用于变电站、工厂、小区、学校、别墅、仓库、机场、军事基地、看守所等场所。 电子围栏系统是一种“有形”的报警系统,实实在在地给人一种威慑感觉,使入侵者增加一种心理压力
人员联络后, XXX 公司将向 所有的用户提供换件维修服务: 72 个工作小时换件维修处理说明 如果用户的设备出现硬件故障,用户可以通过 XXX 公司技术中心的换件维修人员联络,进行产品换件维修程序,换件处理会在收到故障硬件开始 72个工作小时完成。 备件库 用户的设备故障被 XXX 公司技术客户服务人员确认为硬件故障,根据 XXX公司的故障等级和设备种类,对于用户可通过 XXX
发生、信号接收、比较系统、执行机构和外壳等组成。 (3 ) 2. 什么是交流 接触器。 它的动作原理是什么。 它的主要作用是什么。 答:交流接触器 :是一种适用于远距离频繁地接通和分断交流主电路及大容量控制电路的电器。 (2 ) 交流接触器动作原理 : 当线圈通电后,电磁系统的吸力克服反作用弹簧及触头弹簧的反作力使衔铁动作,带动触头运动,使动触头和静触头接触,接通回路。 (2 )
口,可以在不依赖外部控制器的情况下直接输入并在组合屏上以屏幕为单位显示视频图像,图像格式支持NTSC/PAL/SECAM 制式。 通过 显示屏 的内置图像处理 模块 ,直通的复合视频信号除了可以单屏显示以外, 还可以 M N 方式实现任意多屏拼接显示,及全屏显示。 广州市沃尔电子有限公司竭诚与您合作,平等互利,共求进步 联系人:杨艳婷 联系方式: 13560496146
,第 2的“ []”为现在是第几个相位的值。 最后的“ [][][]”,才为时间,单位为秒。 这个步骤,共要输入 16 个数据。 其代表的表格如下: 相位号: 一 二 三 四 五 六 七 八 UTC1000 协调控制式 交通信号机 上海东川交通科技有限公司 15801926288 13 最小绿灯时间: xx xx xx xx xx xx xx xx 最大绿灯时间: xx xx xx xx xx