注塑工程师职责内容摘要:

Ningbo Responsibilities: 1. 审核塑料零件设计的可制造性及工艺能力 Review the producibility and process capability of plastic parts design 2. 持续改进以降低产品成本、改善质量及提高客户满意度 Identify and implement improvements (jointly with manufacturing teams) that reduce product cost, improve quality, and maximize customer satisfaction 3. 审核供应商模具设计方案及报价 Review supplier mold design and quotation 4. 新产品试模并确定最佳工艺参数,识别产品和模具缺陷并使之完善 New product trial molding and decide the best process spec, find the product and mold defects and get improvement 5. 处理注塑生产现场的技术问题 Deal with technical problems on molding production section 6. 注塑车间工装夹具设计 Fixture and tooling design for plastic molding section 7. 持续改进计划的实施 Implementation of continuous improvement program 8. 负责注。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。