20xx外研版(一起)五上unit1therewasn’tapond课件3内容摘要:

in the basket? How many birds are there in the tree? (now) (before) • is was • are were 表示现在 表示过去 — — My hair ___ long now. is It ____ short before. was They ____ old now. They _____young before. are were My hair long before. My hair was very short. wasn’t was not = They were very young. They old before. =were not = weren’t They are / were old now. They were /。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。