人教版新起点英语一上uint6colour课件5内容摘要:

lack? is wearing/ is in/ is dressed in put on in/ wearing/ dressed in dress wears Language point 1. 2. 单独用: 宁愿做某事 否定形式为 would rather not do sth I would rather wear blue than (wear) red. . 我宁愿穿蓝色而不是红色 . 宁愿 … 而不愿 … would rather do A than do B would rather do sth 1. 我宁愿要小的而不要大的 . 2. 我宁愿呆在家而不愿去公园 . I would rather have the small one than the big one. I would rather_______ (stay) at home than ________ (go) to the park. stay go … 没问题 . … 有问题 . … 有问题吗 ? There’s nothing wrong with sb/ sth. There’s something wrong with sb/sth. Is there anything wrong with sb/ sth? 3. Blue l。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。