新人教版英语高一上module1unit5nelsonmandel--amodernhero同步测试二内容摘要:
quite nicely, so the butcher often 28 him doing all the serving 29 he went to the back room to do the accounts(账目). In the hospital, 30 , he was, of course, allowed to do the simplest jobs, 31 helping to lift people and to 32 them from one part of the hospital to another. Both at the butcher’s shop and at the hospital, Dick had to 33 white clothes. One evening at the hospital, Dick had to help a woman from her bed to the place 34 she was to have an operation. The woman was already feeling frightened at the35 of the operation before he came to get her, but when she saw Dick, she fainted away(晕过去). 16. A. on B. in C. at D. with 17. A. pay for B. pay off C. pay to D. pay back 18. A. Instead B. Instead of C. In spite of D. In need of 19. A. tried to B. hope to C. wanted to D. was anxious to 20. A. too B. very C. so D. much 21. A. it’s B. this C. that D. it 22. A. at B. on C. by D. for 23. A. in order that B. as to C. as so to D. so as to 24. A. with B. for C. to D. because of 25. A. look for B. find C. reach D. take 26. A. day time B. the night C. the night time D. the daytime 27. A. at night B. at noon C. in the morning D. in the daytime 28. A. let B. left C. made D. had。新人教版英语高一上module1unit5nelsonmandel--amodernhero同步测试二
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。