新人教版英语高一上module1unit1friendship(section2)同步测试内容摘要:
e that the man he was__2__was a rich man and no longer pay a visit to his friend. __4__talking with his friend, Sheikh asked him the__5__for the change in his man replied that he had been so poor that he was forced to__6__some properties (财产 ) that belonged to him, like furniture (家具 ). By selling these things, he had__7__some money enough to start a__8__with. As he was on his way back to his house with the__9__, he saw a poor lady__10__by the man asked the lady the reason, and she__11__that her husband died and her children this, the man felt__13__for her, and on seeing that she__14__the money more than himself, he gave all the money to and spent the night sad and__16__for his family. The next morning, __17__he was summoned (召唤 ) to the house of a rich was told by the rich man that he had six thousand bags of__18__which he wanted to sell quickly and the man could buy it at a__19__price on loan (借用 ) from poor man did so and sold the took some more bags several days later and in this way he was able to make much more he became rich. 【语篇解读】 本文通过一个穷人帮助另一个急需帮助的人后生活发生的变化阐明了一个道理: 好人自有好报。 1. B. clever C. rich D. lazy 【解析】 下文多处 poor都有提示。 另外与本空后的 needy 构成并列关系:他是一个贫困的人。 【答案】 A 2. with B. asking about C. waiting for D. listening to 【解析】 本空前 asked about提示:他正在 “ 问及 (asking about)” 的那个人再也不穷了。 【答案】 B 3. B. refused C. tried D. decided 【解析】 为了了解原因,他 “ 决定 (decided)” 去看望一下老朋友。 【答案】 D 4. B. After C. While D. Until 【解析】 Sheikh去拜访朋友,是在与朋友聊天的时候问了朋友一些情况。 while表示“ 在 „„ 期间,当 „„ 时候 ”。 【答案】 C 5. B. message C. time D. plan 【解析】 由本空后的 the change 及下文朋友的回答可知,他想知道朋友生活状况改善的原因。 【答案】 A 6. B. sell C. keep D. find 【解析】 根据本空前的 poor判断:他穷到了卖家产的地步。 下句中的 selling 也是提示。 【答案】 B 7. B. saved C. paid D. wasted 【解析】 通过变卖家产,他终于 “ 筹集 (collected)” 到了一笔钱。 【答案】 A 8. B. family C. business D. lesson 【解析】 由于贫困,他只能是先利用这笔钱做点事儿,挣点儿钱,解决家人的温饱问题。 【答案】 C 9. B. hop。新人教版英语高一上module1unit1friendship(section2)同步测试
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。