牛津苏教四下unit6let’sgobytaxi课件之五内容摘要:
, station, go to the station by car. Airport, airport, go to the airport by taxi. Theatre, theatre, go to the theatre by bike. go to the library go to the station go to the theatre go to the airport go to Shanghai go to Beijing go to Paris go to Xi’an S。牛津苏教四下unit6let’sgobytaxi课件之五
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。