牛津上海版英语九下chapter2educationalvisits同步练习内容摘要:
though B. even if C. as D. since 12. ____ to the doctor right away, he might have been alive. A. If he went B. Were he gone C. Should he have gone D. Had he gone 13. If you were older, I ____ you to go there yesterday. A. will allow B. should allow C. would have allowed D. had allowed 14. The secretary suggested that they ____ the men in at once. A. had brought B. should have brought C. brought D. bring 15. I wish I ____ able to tell him all about it last night. A. was B. were C. had been D. should be 16. If we ____ here ten minutes earlier, we ___ the bus. A. arrived/would catch B. arrived/would have caught C. had arrived/had caught。牛津上海版英语九下chapter2educationalvisits同步练习
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。