甘肃省武威市凉州区20xx-20xx学年七年级英语下学期期中试题人教新目标版内容摘要:

. cats D. sheep 6. B. animals C. dolphin D. koala 7. B. not C./ D. can’t 8. B. cute C. dangerous D. shy 9. B. why C. what D. how 10. A. But B. And C. So D./ 六.阅读理解 ( 2*15) A Pat Hogan was traveling around the country in his car. One evening he was driving along a road and looking for a small hotel, when he saw an old man at the side of the road. He stopped his car and said to the old man, I want to go to the Sun Hotel. Do you know it? Yes, the old man answered. I39。 ll show you the way. He got into Pat39。 s car, and they drove for about twelve miles. When they came to a small house, the old man said, Stop here. Pat stopped and looked at the house. But this isn39。 t a hotel, he said to the old man. No, the old man answered, this is my house. And now I39。 ll show you the way to the Sun Hotel. Turn around and go back nine miles. Then you39。 ll see the Sun Hotel on the left. ( ) 1. Where was Pat looking for? A. The Sun Hotel. B. The Moon Hotel. C. The Star Hotel. ( ) 2. Whom did Pat meet? A. A policeman. B. An old man. C. An old woman. ( ) 3. Where did the old man take Pat to? A. The Sun Hotel. B. A supermarket. C. The old man39。 s House. ( ) 4. How far did Pat drive after the old man got on his car? A. Five miles. B. Twelve miles. C. Three miles. ( ) 5. How far was the hotel from where Pat saw the old man? A. Twelve miles. B. Nine miles. C. Three miles. B Elephants Elephants are the biggest animals that live on land. Only some kinds of whales are bigger, but they live in the sea. The elephant is the second biggest animal in the world. Elephants are the only animals that have long noses that are called trunks. They can use trunks like hands. With its trunk, an elephant can pick up a 270kg tree, or pick up one peanut. Elephants have the biggest ears of all the animals. Their tusks are the biggest teeth. There are two kinds of elephantsAfrican elephants and Indian elephants。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。