北师大版英语高一下册module3unit9wheelslesson3同步测试内容摘要:

er several times before that. A. had been。 have met B. have been。 have met C. had been。 had met D. have been。 had met 3. The policemen ____ for the missing child for whole day and ____ him yet. A. have looked。 didn’t find B. have been looking。 haven’t found C. looked。 haven’t found D. have looked。 haven’t found 4. I _____ grammar for ten years, but I still can’t speak English. A. had studied B. studied C. an studying D. have been studying。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。