天津市20xx年红桥区九年级英语一模试卷及答案外研版内容摘要:

” “Give him a cabbage!” Tom said. “That39。 s a good idea.” said the farmer. Soon he found a cabbage and showed it to the cow. When the cow saw the cabbage, it walked after the farmer at once. All the cars and buses could get past at last. 51. Tom went out for a walk _____ . A. with a group of people B. with Bill C. with a farmer D. all by himself 52. The cow was _____. A. on the way to work B. the strongest animal C. in the middle of the road D. pleased to see so many people 53. Tom and Bill _____. A. helped to move away the cow B. waited for the trucks to get past first C. were sad to see the cow was hungry D. went up and saw a cow in the middle of the road 54. Why were the drivers of cars and buses worried? A. Because they couldn’t get past. B. Because they couldn’t move the cow. C. Because Tom and Bill laughed. D. Because the policeman didn’t do anything. 55. From the story we can see that _____ . A. Tom was clever B. The drivers are clever C. the cow was clever D. the farmer and the policeman are clever B Where is Love? How can we find Love? Once a little boy wanted to meet Love. He knew it was a long trip to where Love lived, so he got his things ready with some pizzas and drinks and started off. When he passed three streets, he saw an old woman sitting in the park and watching some birds. She looked very hungry. The boy gave her a pizza. She took it and smiled at him. The smile was so beautiful that he wanted to see it again, so he gave her a Coke. She smiled once again. The boy was very happy. They sat there all the afternoon, eating and smiling, but they said nothing. When it grew dark, the boy decided to leave. But before he had gone more than a few steps, he turned around, ran back to the old woman and gave her a hug. The woman gave him her biggest smile ever. When the boy opened the door of his house, his mother was surprised by the look of joy(快乐 )on his face and asked what had made him so happy. “I had lunch with Love. She has got the most beautiful smile in the world.” At the same time, the old woman’s son was also surprised at his mother’s pleasure and asked why. “I ate a pizza in the park with Love,” she said, “and he is much younger than I expected.” If the world is full of love, we can enjoy a better life. 56. When the little boy saw the old woman, she was ____ . A. looking for a seat in the park B. passing the street C. looking at some birds D. having a pizza 57. The little boy gave the old woman a Coke because ____. A. the old woman still felt hungry B. he wanted to see the smile again C. he didn’t like the drink D. the old woman paid him for it 58. The old woman gave the little boy the biggest smile ____. A. after the little boy went home B. before it grew dark C. when she was drinking Coke D. after the little boy hugged her 59. The boy’s mother was surprised to see her son was very ____ when the door opened. A. pleased B. sad C. unhappy D. angry 60. Which of the following is TRUE? A. The little boy failed to find Love. B. The old woman gave the little boy a hug to thank him. C. Both the little boy and the old woman found what they wanted at last. D. The little boy decided never to go home. C Michelle, a famous lady, has found that more than 25% students are too fat in her country. It is a very serious problem. So she starts a health program to deal with it. The health program is to reduce the amount of fat students today and in the future. The program will get families, schools, newspapers, magazines and TVs to join together and deal with the students’ obesity so that students will be at a healthier weight. The。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。