辽宁省丹东市20xx-20xx学年八年级英语下学期期中试题内容摘要:

40. A. sad B. funny C. bad D. good 41. A. bike riding B. climbing C. hiking D. fishing 42. A. borrowed B. bought C. spent D. brought 43. A. sunglasses B. pants C. socks D. shoes 44. A. want B. dream C. like D. need 45. A. chair B. bike C. floor D. car :( 20分) 46 47 48 49 50 51 52 53 54 55 (A) The trouble started when Mrs. Cady lost control of her car on a mountain road. The car fell down thirty feet from the road into the water. It rolled(滚动 ) over once and landed right side up in the rushing water. All three people, Mrs. Cady, and her two daughters, were wearing their seatbelts. Luckily, nobody was hurt。 however, they couldn’ t leave the car. The rescue(救援 ) started almost at once. Another driver told the police about the trouble. The police called rescue workers and a truck to pull the car out. The driver of the truck, Paul, arrived first. Immediatedly (立刻 ) he took a rope from his truck and began to walk through the rushing water to the car. Then he got caught in the ropes. He went under the water. Mrs. Cady saw him and pulled as hard as she could and brought him to the car door. Next the other rescue workers arrived. They put on special suits to keep warm. They brought safety ropes, life jackets, and warm blankets(毯子 ). First they pulled the people out of the back window onto the top of the car. Then they swam with each person to the shore(岸 ). They saved Paul, Mrs. Cady, and the little girls. 根据短文内容,选择正确答案。 ( 5分) did the trouble start? In the river B. On a mountain road C. Under the water D. In a big city many people were in danger? A. One B. Two C. Three D. Four was Paul? A. A man in Mrs. Cady’ s car B. A policeman C. A doctor D. The driver of a rescue truck brought Paul to the car door? A. Mrs. Cady B. Mr. Cady C. The girls D. The rescue workers was the most possible season when the trouble took place? Spring B. Summer C. Autumn D. Winter (B) While I was waiting for my wife outside her office building, I saw a beggar(乞丐 ) ing to me. “I hope he won’ t ask me for any money,” I thought. He didn’ t. he came and sat in front of the bus stop, but it seemed that he didn’ t have enough money to take the bus. “ That’ s a pretty car,” he said after a few minutes, pointing to my car. I gave him a smile and went on cleaning my car. He sat there quietly as I worked. “ Do you need any help?” I asked. “ Don’ t we all?” he said. The three simple words surprised me and I should never fet. I was feeling successful and important, above a beggar in the street, until those three words hit me like a gun(枪 ). Don’ t we all? I needed help, maybe not for money or a place to sleep, but I needed help. I gave him some money not only enough for a bus, but eno。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。