冀教版初中英语八年级上册单元测试-unit8内容摘要:
beautiful D. the most beautiful 10. The doctor told him _______ more water. A. drink B. to drink C. drank D. drinking 11. A: How long can she _______ the book? B: Two weeks. A. borrow B. lend C. keep D. return 12. Your parents are both teachers, ______ they? A. are B. aren39。 t C. do D. don39。 t 13. She _____ a good teacher. We all like her. A. am B. are C. be D. is 14. “Whose ruler is it?”“It39。 s ________.” A. Jim B. Ann C. Kate39。 s D. Linda 15. A: _____ you speak Japanese? B: No, I can39。 t. A. Must B. Can C. May D. Need VI、书面表达: 上星期天芳芳和朋友们去公园了。 她在路上看到一块手表。 她怎么做的。 1. last Sunday, Fang Fang, go, friends 2. see, watch, on the ground 3. pick up, think, whose 4. give, policeman. Ⅷ 、阅读 理解: Mrs Janes didn39。 t have a husband, but she had two sons. They were big, strong boys, but they were lazy (懒 ). On Saturdays they did not go to school, and then their mother always said, “Please cut the grass in the garden this afternoon, boys,”The boys did not like it, but they always did it. Then somebody gave one of the boys a magazine, and he saw a picture of a beautiful lawnmover (割草机 ) in it. There was a seat on it and there was a woman on the seat. The boy took the picture to his mother and brother, and said to them, “。阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。