仁爱版英语八下unit6enjoyingcycling同步测试内容摘要:

makes stops in a race, a team of people will ____. A. help him make the stops short B. lift the car up and change the tyres C. put petrol in the car and clean the car D. clean the driver’s helmet ( )40. In the world of car racing, the race has to be timed to ____. A. second B. 10. 81 second C. 1/100th of a second D. 1/1000th of a second (B) Accident Report Form Accident A car hit a tree. Four people were in the car. Weather condition There was a heavy rain. Cause The driver named Li Jun drank too much. Date of call March 20th, 2020 Time of call 8:30 . Name of caller A man called Zhang Wei. (He was taking a walk there at that time.) Place Zhongshan Road, Nanjing Conditions of victims Mr. Green hurt his head. Mrs. Green hurt her left leg. Their daughter felt frightened. Their dog died. Action Policemen arrived at 8:40 . and sent the victims to Gulou Hospital at 8:45 . ( )41. What time did Zhang Wei call the police? A. At 8:30 a. m. B. At 8:30 p. m. C. At 8:40 p. m. D. At 8:45 p. m. ( )42. How many people were there in the cars? A. One. B. Two. C. Three. D. Four. ( )43. Whose left leg was hurt? A. Mrs. Green’s. B. Their daughter’s. C. Mr. Green’s. D. Their dog’s. ( )44. What was the weather like that day? A. It was sunny. B. It was snowy. C. It was cloudy. D. It was rainy. ( )45. Which of the following is TRUE? A. The car hit a wall. B. The accident happened on Zhongshan Road in Beijing. C. The driver drank too much. D. The policemen arrived half an hour later and sent the victims to the hospital. (C) Wele to the Coconut Hotel. It takes about five minutes to walk to the city center. All the hotel rooms have the following features(特色 ): ▲ good views of the city ▲ 20 square meters in size ▲ modern bathrooms The hotel also has the following facilities(设施 ): ▲ large swimming pool which opens at 6:45 am. ▲ a souvenir shop(纪念品店 ) that is open from 9:00 am to 5:30 pm. ▲ a games center ▲ a dinning room where breakfast is served from 8:00 am to 9:30 am。 lunch from 11:30 am to 2:30 pm。 dinner from 6:30 pm to 9:30 pm. ▲ a snack bar(小吃店 ) which is open from 9:30 am to 1:00 pm. ( ) 46. The above information is about _____. A. a swimming pool B. a bar C. a shop D. a hotel ( ) 47. If the guests(顾客 ) in the hotel want to go to the city center, they had better go there ____. A. on foot B. by subway C. by train D. by ship ( ) 48. If the guests want to have a swim, they should go to _____. A. the city center B. the games center C. the swimming pool D. the bathroom ( ) 49. We can have supper from ____ in the hotel. A. 5:30 pm to 9:00 pm B. 6:45 pm to 9:30 pm C. 1:00 pm to 6:30 pm D. 6:30 pm to 9:30 pm ( )50. If you arrive at the hotel at 11:00 pm and feel hungry, what should you do? A. Go to the dinning room. B. Go to the shop. C. Go to the snack bar. D. Go to the bathroom. 第三部分 写作( 20 分) Ⅰ . 词汇部分。 (5 分 ) (A)根据句意及首字母提示填空。 51. You may call the police when you are in t____. 52. Beijing is in the n____ of China. 53. The headmaster called on(号 召 ) the students to r______ money for the poor boy. 54. In China, when you see the yellow lights, please s____ down. 55. I want to book a s____ room with two single beds. (B)根据句意及汉语提示填空。 56. He lives at the ______ (顶部 ) of the building. 57. Mary won the game. She was ____ (成功的 ). 58. There are twenty ____ (乘客 ) in the bus. 59. It is ____ (不可能的 ) to finish this work in an hour. 60. Bicycle accidents can also bring us sadness and ____ (死亡 ). Ⅱ . 句型转换。 (5 分 ) 61. I don’t think he is a teacher, ____ ____?(完成反义疑问句 ) 62. She paid 100 yuan for the coat. (改为同义句 ) She ____ 100 yuan ____ the coat. 63. Tom gets a letter from his father every month. (改为同义句 ) Tom ____ ____ his father every month. 64. Tony doesn’t know which book he should choose. (改为同义句 ) Tony doesn’t know which book ____ ____. 65. To spit everywhere is impolite. (改为同义句 ) ____ is impolite _____ spit everywhere. Ⅲ . 书面表达。 (10 分 ) 随着人口的增长和家庭轿车的普及,交通安全问题已成为千家万户关注的焦点。 作为。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。