【2017年整理】常用模具零件中英文对照表内容摘要:
1、常用模具零件中英文对照表 2005-12-19 14:51:17 中国注塑网 一、入水:gate 进入位:gate location 水口形式:gate type 大水口:edge gate 细水口: pin-point gate 水口大小:gate size 转水口:switching runner/gate 唧嘴口径:sprue diameter 二、流道: runner 热流道:hot runner,hot manifold 热嘴冷流道: hot sprue/cold runner 唧嘴直流: direct sprue gate 圆形流道:round(full/half runner 流 2、道电脑分析:mold flow analysis 流道平衡:runner balance 热嘴:hot sprue 热流道板:hot manifold 发热管:cartridge heater 探针: thermocouples 插头:connector plug 插座: connector socket 密封/封料: seal 三、运水:water line 喉塞:line lpug 喉管:tube 塑胶管:plastic tube 快速接头:jiffy quick connector plug/socker 四、模具零件:mold components 三板模:3-plate mold 二 3、板模:2-plate mold 边钉/导边:leader pin/guide pin 边司/导套:bushing/guide bushing 中托司:shoulder guide bushing 中托边:guide pin 顶针板:ejector retainner plate 托板:support plate 螺丝: screw 管钉:dowel pin 开模槽:ply bar scot 内模管位:core/cavity inter-lock 顶针:ejector pin 司筒:ejector sleeve 司筒针:ejector pin 推板:stripper plate 缩呵:movab 4、le core,return core core puller 扣机(尼龙拉勾):nylon latch lock 斜顶:lifter 模胚(架): mold base 上内模:cavity insert 下内模:core insert 行位(滑块): slide 镶件:insert 压座/斜鸡:wedge 耐磨板/油板:wedge wear plate 压条:plate 撑头: support pillar 唧嘴: sprue bushing 挡板:stop plate 定位圈:locating ring 锁扣:latch 扣鸡:parting lock set 推杆:push bar 栓打 5、螺丝:S.H.S.B 顶板:eracuretun 活动臂:lever arm 分流锥:spure sperader 水口司:bush 垃圾钉:stop pin 隔片:buffle 弹弓柱:spring rod 弹弓:die spring 中托司:ejector guide bush 中托边:ejector guide pin 镶针:pin 销子:dowel pin 波子弹弓:ball catch 喉塞:pipeplug锁模块:lockplate斜顶:anglefrompin斜顶杆:angleejectorrod尼龙拉勾:partinglocks活动臂:leverarm复位键、提前回杆:earl 6、yreturnbar气阀:valves斜导边:anglepin术语:terms承压平面平衡:partingsurfacesupportbalance模排气:partinglineventing回针碰料位:returnpinandcavityinterference模总高超出啤机规格:moldbaseshuthight顶针碰运水:waterlineinterfereswithejectorpin料位出上/下模:partfromcavith(core)side模胚原身出料位:cavitydirectcutonA-plate,coredirectcutonB-plate.不准用镶件:Donotuse 7、(core/cavity)insert用铍铜做镶件:useberylliumcopperinsert初步(正式)模图设计:preliinary(final)molddesign反呵:reversecore弹弓压缩量:springcompressedlength稳定性好:goodstability,stable强度不够:insufficientrigidity均匀冷却:evencooling扣模:sticking热膨胀:theroexpansion公差:tolorance铜公(电极):copperelectrode 塑件模具相关英文词汇出处:FanE翻译中国 作者:( 转载) FanE翻译中国 8、2005-12-16 20:41:59如需转载,请注明来自:FanE 翻译中国http;/www.FanE.cncompre sion molding 压缩成型 flash mold 溢流式模具 plsitive mold 挤压式模具 split mold 分割式模具 cavity 型控 母模 core 模心 公模 taper 锥拔 leather cloak 仿皮革 shiver 饰纹 flow mark 流痕 welding mark 溶合痕 post screw insert 螺纹套筒埋值 self tapping screw 自攻螺丝 striper plate 脱料板 piston 9、活塞 cylinder 汽缸套 chip 细碎物 handle mold 手持式模具 encapsulation molding 低压封装成型、射出成型用模具 two plate 两极式(模具) 如需转载,请注明来自:FanE翻译中国http;/www.FanE.cnwell type 蓄料井 insulated runner 绝缘浇道方式 hot runner 热浇道 runner plat 浇道模块 valve gate 阀门浇口 band heater 环带状的电热器 spindle 阀针 spear head 刨尖头 slag well 冷料井 cold slag 冷料渣 air ve 10、nt 排气道 welding line 熔合痕eject pin 顶出针 零件英语 punch 冲头 insert 入块( 嵌入件) deburring punch 压毛边冲子 groove punch 压线冲子 stamped punch 字模冲子 round punch 圆冲子 special shape punch 异形冲子 bending block 折刀 roller 滚轴 baffle plate 挡块 located block 定位块 supporting block for location 定位支承块 air cushion plate 气垫板 air-cushion ej 11、ect-rod 气垫顶杆 trimming punch 切边冲子 stiffening rib punch = stinger 加强筋冲子 ribbon punch 压筋冲子 reel-stretch punch 卷圆压平冲子 guide plate 定位板 sliding block 滑块 sliding dowel block 滑块固定块 active plate 活动板 lower sliding plate 下滑块板 upper holder block 上压块 upper mid plate 上中间板 spring box 弹簧箱 spring-box eject-rod 弹簧箱顶杆 12、 spring-box eject-plate 弹簧箱顶板 bushing bolck 衬套 cover plate 盖板 guide pad 导料块 14. electrical discharge machining (EDM) 电火花加工15. electrical insulating property 电绝缘性能16. electrochemical die-sinking machine 电解型腔加工机,电解型腔加工机床17. electrochemical machine (ECM) 电解加工机床,电化学加工机床18. electrochemical machining (ECM 13、) 电解加工,电化学加工19. electro-discharge cutting 电火花加工,电火花切割20. electro-discharge cutting machine 电火花切割机21. electro-discharge machine tool 电火花加工机床22. Electro-discharge Machine 电火花加工机床23. electro-discharge machining 电火花加工24. electro-discharge machining process 电火花加工工艺,电火花加工工序25. epoxy resin 环氧树脂9. guide bus 14、hing 导套10. guide pillar 导柱,导杆,导柱11. guide pin 导向销,导杆12. guide pin cover 导柱盖13. guide plate 导料板,导板14. guide plate blanking die 导板式冲裁模,导板式落料模15. guide post 导柱,导柱16. guide stock plate 挡料板4. injection mold 注射模,注塑模5. injection molding 注射成型,注塑成型6. injection-molding machine 注塑机,注射机,注塑成形机7. injection plunge 15、r 注射柱塞8. in-line reciprocating screw 联机往复螺杆,串联往复螺杆,直线排列往复螺杆9. inner ram 内滑块10. inserting molding 嵌件成形11. integrated manufacturing 集成制造12. internal stress 内应力13. intermediate platen 中间板,隔板塑料成型模具的主要设计要素 脱模距 stripper distance脱模斜度 draft投影面积 projected area最大开距 maximum daylight;open daylight闭合高度 mould-shu 16、t height抽芯距 core-pulling distance抽芯力 core-pulling force脱模力 ejector force开模力 mould opening force模内压力 internal mould pressure;cavity pressure成型压力 moulding pressure背压环 back-up ring1 bar = 14.5psi 高压接头 bite type fitting液压马达 hydraulic motor冷却水流量计 waterflow regulator打磨器材 abrasive material打磨砂轮 grinding wheels切割砂轮 cutting。【2017年整理】常用模具零件中英文对照表
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。