牛津译林版中考英语专题复习省略练习题内容摘要:
D. was broken into。 was stolen 18. She dances better than Mary . A. is B. has C. does D. dance 19. Lucy has more foreign friends than Lily . A. is B. has C. have D. does 20. I hope to see you at the office tomorrow, but if , do remember to leave me a message. A. possible B. so C. not 21. You haven39。 t lost your library book, have you? I hope . A. not to have B. to have not C. so D. not 22. Has Alice had an accident? . A. I don39。 t hope so B. I hope not to C. I hope not D. l hope not have 23. The girl spends at least as much time singing as she . A. studies B. does in studying C. is studying D. does to study 24. Don39。 t bring food to the party. If you , I39。 ll take it away. A. are B. do C. will 25. I think he likes Chinese very much. Why do you think ? A. it B. that C. so D. this 26. Is he going to the party? I39。 m . He39。 s very busy. A. not afraid B. afraid not C. no afraid D. not 27. Why not go to the office and ask your teacher for help? I . But I didn39。 t find her there. A. will B. would C. have D. shall 28. Jimmy lost his key yeste。牛津译林版中考英语专题复习省略练习题
相关推荐
onth of 278 BC in the Milo River in despair over his country39。 s future. Hearing of his death, people who loved Qu raced in boats to recover his body from the river and threw zongzi into it to feed
B. both。 and C. neither。 nor D. either。 or ( ) I know, more and more people in the world ar e learning Chinese. A. As well as B. As often as C. As soon as D. As far as ( ) is better to travel 10,000
istoric Ming can shop at a popular Jade Factory, too. (3.) Beijing City Tour C: T emple of Heaven, Summer Palace, Pearl Factory. Price: 400Yuan/ per person ☆ After breakfast you will travel to the
othing but sleep B. do anything but sleep C. do nothing but to sleep D. do anything but to sleep 32. You can either sing ______ dance ______ weekends. A. and, on B. or, on C. and, at D. or, in 33.
2、根系尚未活动,不能及时吸收水分,致使枝条失水,出现抽条现象,春季经常往树上喷水可减少抽条。 无花果萌芽力较强,为减少养分消耗,可在春季展叶 23 片时分 2 次进行疏梢,5 年生树每株留 5060 条结果枝即可。 夏季5 月下旬至 7 月上旬,温度适宜,光照充足,为无花果花芽分化和新梢生长的高峰期,应及时补充营养。 一般在 6 月上旬、7 月上旬进行两次追肥,在距主干 5080,挖深
2、雷锋的良种化和茶树良种的无性化。 这也是实现我市茶业现代化的一项重要的基础工程下面将分期向茶农朋友们推荐一批适宜我市种植的无性系茶树良种:一、迎霜:迎霜是国家级茶树良种。 系杭州市茶科所从福鼎大白茶与云南大叶种的自然杂交后代中单株选育而成的无性系茶树新品种。 属小乔木型、中叶类、早芽种。 其树姿直立,分枝部位较高,植株较高大;分枝和发芽的密度中等,生长势旺盛,发芽轮次多,育芽能力特强