凯恩特(塑钢、铝合金门窗)公司安全生产管理规定(编辑修改稿)内容摘要:
facilities when carrying out poisonous and hazardous operations. /劳动场所布局要合理,保持清洁、整齐。 有毒有害的作业,必须有防护设施。 Production facilities and buildings should be solid and safe. Passages should be flat and smooth with enough light. The dangerous places designed for production, such as pit, trench, pool, walking bench, and panion hatchway must be equipped with safety facilities and noticeable safety marks. /生产用房、建筑物必须坚固、安全;通道平坦、畅顺、要有足够的光线;为生产所设的坑、壕、池、走台、升降口等有危险的处所,必须有安全设施和明显的安全标志。 The workplace at risk of high temperature, low temperature, damp, lightning, and static must be equipped with corresponding effective protection measures. /有高温、低温、潮湿、雷电、静电等危险的劳动场所,必须采取相应的有效防护措施。 5 Inflammables and Explosives /易燃、易爆物品 Fireproof and explosionproof facilities should be equipped when transporting, storing, using, and disposing scraps of inflammables and explosives. Strictly observe safe operation rules and safety regulations on staffing, quantity quota and material type. /易燃、易爆物品的运输、贮存、使用、废品处理等,必须设有防火、防爆设施,严格执行安全操作守则和定员定 量定品种安全规定。 Fire and smoking are not allowed in the places for using and storing inflammables and explosives. Strictly eliminate all the hidden troubles that properly cause fires. When fires are required for checking equipment, proper protective measures should be used. Such an inspection should be approved by related leaders and carried out under the supervision of dedicated persons. /易燃、易爆物品的使用地和贮存点,要严禁烟火,要严格消除可能引发火灾的一切隐患。 检查设备需要动用明火时,必须采取妥善的防护措施,并经有关领导批准,在专人监护下进行。 6 Personal Protective Articles and Prevention and Treatment of Occupational Hazards /个人防护用品和职业危害的预防与治疗 According to job nature and labor regulations, equip employees with personal protective articles or deliver personal protective articles to them. Each unit must teach employees how to use protective articles. The employees who do not know the purpose and performance of protective articles cannot assume their own posts. /根据工作性质和劳动条例,为职工配备或发放个人防护用品,各单位必须教育职工正确使用防护用品,不懂得防护用品用途和性能的,不准上岗操作。 Try to carry out dustproof, antipoison, radiationproof, temperature reduction against high temperature, and antinoise measures and always monitor sanitation. In the poisonous and hazardous workplaces below national sanitation standard, reconstruct technologies or implement protective measures, continuously improve work conditions, grant subsidies of healthcare food, and improve health level of employees who carry out poisonous and hazardous operations. /努力做好防尘、防毒、防辐射、防暑降温工作和防噪音工程,进行经常性的卫生监测,对超过国家卫生标准的有毒有害作业点,应进行技术改造或卫生防护措施,不断改善劳动条件,按规定发放保健食品补贴,提高有毒有害作业人员的健康水平。 Arrange body check of employees who carry out poisonous and hazardous operations once every year. Immediately report the employees who have been confirmed occupational disease patients to the HR Department of the pany. The HR Department or Safety Committee should adjust their posts according to the actual situation and timely make decisions of curing or recuperation. /对从事有毒有害作业人员,要实行每年一次定期职业体检制度。 对 确诊为职业病的患者,应立即上报公司人事部,由人事部或公司安委会视情况调整工作岗位,并及时做出治疗或疗养的决定。 7 Check and Reconstruction /检查和整改 Insist on implementing the systems of regularly or irregularly checking work safety. The Safety Committee should anize the whole pany to check work safety at least twice every year. Each production unit should check work safety at least once every quarter. Each production team should check work safety before and after each shift. The operators of special types of work and equipment should check work safety every day. /坚持定期或不定期的安全生产检查制度。 公司安委会组织全公司的检查,每年不少于两次;各生产单位每季检查不少于一次;各生产班组应实行班前班后检查制度;特殊工种和设备的操作者应进行每天检查。 In case of any unsafe hidden troubles, carry out reconstruction in time. If the unit where reconstruction cannot be implemented, report this case to the Safety Committee for reconstruction. /发现不安全隐患,必须及时整改,如本单位不能进行整改的要立即报告安委办统一安排整改。 The expenditures required for reconstruction for work safety are listed as labor safety expenditure after being approved by the Safety Committee Office. /凡安全生产整改所需费用,应经安委办审批后,在劳保经费项目列 支。 8 Award and Punishment /奖励与处罚 The pany’s work safety should be summarized once every year. Based on the summar。凯恩特(塑钢、铝合金门窗)公司安全生产管理规定(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。