20xx版七年级英语下册module8storytime检测外研版内容摘要:

号 62434091 Two frogs(青蛙 )lived in a village all their would like to go and see the big was about 20 km away from their village. They talked about it for a long time,and at last they went to see the big city. It was a hot day,and they soon began to feel only walked a little way when one said to the other,“We must be near you see the city?” “No,” said the other frog,“but if I climb( 爬 )on your back I may be able to see it.” So that the small frog climbed up on the back of the big frog to see the city. Now when the small frog put up his head,his eyes could only see what was behind,and not what was in he saw the village they just left. “Can you see the city?” asked the big frog. “Yes,” answered the small frog.“I can see looks just like our vi llage.” Then the frogs went back and said to the frogs around the village “We saw the city,and it was just like our village.” many frogs wanted to see the big city? B . . . . weather was A on that day. the frog climbs up the other frog,he can’t see the B . 29. D saw the big city. small frog big frog the big and the small frog (两者都不 )of the frogs the passage,we know C . frogs can’t go to the city city is like the frogs’ village small frog makes a mistake big frog can go to the city Ⅳ .词汇运用 (每小题 1分 ,共 15分 ) 据首字母提示完成句中单词。 upon a time,t。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。