20xx版七年级英语下册module11bodylanguage检测外研版内容摘要:

he first name es before the family name. the four pictures(a,b,c,d),which is the same way to greet each other in the four countries? D this passage,all the following are mentioned EXCEPT C . does the writer want to tell us in the passage? A ways of greeting. countries. and family members. . B 导学号 62434129 My mother used to ask me what the most important part of the body got different answers at different ages. When I was young,I thought sound was very important to us,so I said,“My ears,Mum.” But she shook her head and said years passed,and she asked me believed that I got the right answer after thinking it I told her,“ Sight is very important to everyone,so it must be our eyes.” But she told me I was tried many times after that,but her answer was always the last year,my grandma was crying,and everybody was mom looked at me and asked me with tears in her eyes,“Do you know the answer now?” I was surprised when she asked me this question then.“My son,the answer is your needs a shoulder to cry on(倾诉的对象 ).” Finally,I realized (意识到 )all she hoped is that I can have enough love and friends so that I will have a shoulder to cry on I when I need it. to the passage, D are the most important part of the body. writer gave B to the same question at different ages. same answer answers answers right answer underlined word “Sight” means D in Chinese. 29. B gave the right answer to。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。