福建省福州八中20xx-20xx学年七年级英语上学期期中试题人教新目标版内容摘要:

8. A. Hers B. She C. Her ( )49. A. has B. is C. have ( )50. A. mom B. friends C. dad ( )51. A. at B. the same C. like ( )52. A. e from B. from C. is from ( )53. A. clothes B. teacher C. color ( )54. A. in a red B. in red C. at a red ( )55. A. Who B. Whose C. Where 五、阅读理解。 ( 15分) (A) 根据表格内容,判断 正 (A)误 (B)。 ( )56. Julia is in brown shoes. ( )57. Paul is from the UK. ( )58. Linda’ s number is 7364854. ( )59. Linda is in blue pants. ( )60. Julia and Linda have round faces. (B) I’ m Ann. I’ m English. I’ m twelve. I was born on May 17th , 2Name: Julia Name: Paul Name: Linda From: Cuba From: England From: Canada Look: long hair, round face, big eyes Look: short blond hair, long face, small blue eyes Look: long red hair, round face, big brown eyes Clothes: green dress, white shoes Clothes: yellow jacket, blue pants, brown shoes Clothes: white dress, brown shoes number: 3746360 number: 7364851 number: 51053867 Tel: 543752 Tel: 874599 Tel: 4358390 001. I learn Chinese at Beijing Middle School. I have a good friend. Her name is Lucy. She is twelve, too. We are in the same grade. But we are not in the same class. I’ m in Class Two, and she is in Class Three. We have the same Chinese teacher. Her name is Zhang Ying. We all like her. Lucy’ s parents are both English teachers in C hina. And she has a name is Lily. She is only five years old. 61. Ann and Lucy are _________. A. classmates B. sisters C. brothers D. friends 62. Ann was born _____________. A. on May 17th , 2020 B. on May 17th ,2020 C. in May 17th, 2020 D. in May 17th, 2020 63. Zhang Ying is Lucy’s __________ teacher. A. English B. Chinese C. math D. music 64. Lu。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。