新人教版英语高一上单元测试-module1unit4内容摘要:

________ or burn people and buildings near an erupting volcano. A. cover B. hide C. bury D. trap 8. The two of them never greet each other and behave ________ they were strangers. A. even if B. because of C. such as D. as if 9. We can either ________ some earthworms in my yard or buy some shrimps in the market. A. dig in B. dig out C. dig up D. dig into 10. Did you ask the guard ________ happened? Yes, he told me all ________ he knew. A. what。 that B. what。 what C. which。 which D. that。 that 11. The number of students in our school ________ about 30,000 and ________ students study hard. A. is。 a large amount of B. are。 the number C. is。 large amount of D. is, a large number of 12. I’m not easily ________, but his deed (行为 ) was too disgusting (可恶的 ). A. shocked B. interested C. surprised D. frightened 13. When young Henry came out of the Navy to join his grandfather’s pany, it was ________. A. on ruins B. at ruins C. in ruins D. under ru。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。