外研版英语七下unit2everyonewillhaveasmallcar同步测试一内容摘要:
d now. 单项选择。 ( ) 1. No one will be cold and there will be ______ hot water. A. many B. lots of C. lot of D. lots of ( ) 2. Planes will be very large _____ flying will be very cheap. A. so B. and C. but D. or ( ) 3. It will get warm _____ the North Pole so the seas will be very rough. A. in B. at C. to D. on ( ) 4. But there will be ______ bad weather in the s pring and the autumn. A. a B. an C. the D. / ( ) 5. There will be _____ rain and ______ winds. A. heavy , stron。外研版英语七下unit2everyonewillhaveasmallcar同步测试一
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。