冀教版七上unit3bodyandfeelings单元试题内容摘要:

es Nose Height (身高 ) David short, brown green big metres Mary long, red blue big metres Jack black brown small metres 根据表格内容,判断句子的正 (T)误 (F)。 ( )26. David has short, black hair. ( )27. Mary’s eyes are brown. ( )28. Jack’s hair is black. ( )29. Mary and Jack both (两者都 ) have a big nose. ( )30. David and Jack are the same (相同的 ) height. B Hello! My name is Judy. I’m a student. I have three teachers. They are Miss Sun, Ms. Wood and Mr. Chen. And they teach (教 ) us English, Chinese and art (美术 ). Miss Sun is from Shanghai. She is my art teacher. She is pretty. She is metres tall. Ms. Wood is from Canada. She is metres tall. She has short, brown hair. Her eyes are small and blue. Mr. Chen is my Chinese teacher. He is from China. He is wearing a white shirt and a pair of blue pants. He has small eyes. They are good teachers. I like them. 根据短文内容,选择最佳答案。 ( )31. Miss Sun is ________ tall. A. metres B. metres C. metres D. metres ( )32. ________ is an English teacher. A. Judy B. Miss Sun C. Ms. Wood D. Mr. Chen ( )33. Ms. Wood has ________ hair. A. short, brown B. short, black C. long, brown D. long, black ( )34. Judy’s Chinese teacher is wearing ________. A. a pink dress B. a pair of blue shorts C. a white shirt and a pair of blue pants D. a white sweater and a pair of pants ( )35. ________ are from China. A. Miss Sun and Mr. Chen B. Ms. Wood and Miss Sun C. Mr. Chen an。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。