仁爱版九上topic2alltheseproblemsareveryserious同步测试内容摘要:

_ can realize that. A. nobody B. everybody C. anybody D. somebody 8. –You look so happy! ____ is happy today, it‟s Children‟s Day. A. Nobody B. Everybody C. Anybody D. Somebody 9. I‟ve read several books, but ___ of them is funny. A. neither B. either C. none D. all 10. Mum, Bill is ing to dinner this evening. OK, let‟s give him ___ to eat. A. something different B. different anything C. anything different D. different something you cook eggs with tomatoes? Yes, of course. _________ can do it, it is easy. A. Anyone B. Someone C. No one D. Everyone else 12. Why don‟t you go to the Dinosaur World? I hear there‟s ____ in it. A. something new B. anything new C. new nothing D. nothing new 13. ____ it is raining outside, he still works in the field. A. Although B. Because C. As D. If 14. The thief broke into the house and ____ much money ____ me. A. robbed。 of B. stole。 of C. robbed。 from D. stole。 from 15. The little girl is afraid to speak _____. A. with people B. to public C. in public D. in the open II. 补全对话 A: What are you doing, Hu Ping? B: It‟s you, Jane. I am doing my homework. A: Haven‟t you (1)_______ it? B: Not yet, but very soon. What‟s (2)________? A: I find there is lots of (3)______ on the playground and I hear some of the visitors will e to (4)_____our school soon. We must make it (5)_______ at once. B: Yes, we must. What about (6)______ it? A: Good idea! I like collecting rubbish. B: (7)_____ not ask Tom to go with us? A: Oh, he can‟t. He is (8)_____ in bed today. B: It doesn‟t (9)_______. Let‟s go and clean it right now. A: OK! (10)________ about your homework? B: I‟ll do it this evening. III. 完形填空 Dr Smith had made some kinds of drugs (药 ) which could make cows __1__more milk. But there might be some sideeffects (副作用 ), and Dr Smith wanted to know. Grand was one of Dr Smith‟s friends. He __2__for money very much. He came to ask Dr Smith__3__some drugs when he heard this because he kept many cows on his farm. But Dr Smith didn‟t give him any, because he__4__if the drugs had sideeffects. Grand thought that Dr Smith would be unwilling to see him make a lot of money out of the milk, so he stole some drugs. As soon as the cows__5__the drugs, the milk kept__6__and soon filled all the buckets. Suddenly one of the cows ran towards him. Before Grand knew what__7__, soon the other cows became angry, too, and rushed out of the room. Grand ran as fast as he could. The cows ran and hit here and there like a pack of angry lions. To make the thing __8__, the farm caught fire. The fireman and the fireengines were kept__9__by the angry cows and couldn‟t help at all. “Oh, my God!” Grand cried in tears. “It‟s all over with me.” He was right. What he had got was nothing __10__a broken dream. 1. A. do B. to do C. produce D. to produce 2. A. liked B. about C. loved D. cared 3. A. for B. about C. to D. of 4. A. wasn‟t sure B. didn‟t make sure C. was sure D. make sure 5. A. give B. were given C. gave D. were giving 6. A. e out B. e in C. ing out D. happened 7. A. happen B. happened C. had happened D. happening 8. A. bad B. badly C. worse D. worsely 9. A. far away B. from C. away D. away from 10. A. just B. but C. and D. so IV. 阅读理解 A The world is not only hungry。 it will also be thirsty for water. About 97 % of water on the earth is sea water, or salt water. Man can only drink or。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。