人教(新版)五年级下册单元试题六内容摘要:

写 “F”。 ( 10分,每小题 2分) It’s a Saturday morning. All the students of Class Three are having a good time in the woods. They are going on a field trip. Look! The English teacher, Mr Chen is playing games with Tom. Chen Jie and May are watching insects with their Chinese teacher, Miss Lee. Mike is drawing pictures of the flowers. Jack and Wu Yifan are picking up the leaves. They like collecting leaves very much. The other students are playing on the grass. They are having a good time. ( ) students of Class Three are going on a farm trip. ( ) English teacher Miss Lee is playing games. ( ) is drawing pictures of the flowers. ( ) and Wu Yifan like collecting leaves. ( ) the students are having a good time. 七 、 连词成句。 ( 10 分,每小题 2分) 1. father, is, where, your (?) 2. they, honey, the, are, having (?) 3. report, writing, Amy, a, is (.) 4. dishes, do, can, the, she (.)。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。