【新目标】初一级下学期英语期末试卷内容摘要:

Gray played basketball with his friends. My sister Gina stayed at home in the morning and played the piano. I stayed at home,too. I studied for a math test. In the afternoon I went to the beach. On Saturday night, my family and I had dinner at home. Then we went to the movies. On Sunday morning,my family stayed at home. My sister and I cleaned our room,and my brother played puter games. In the afternoon my grandparents visited were happy to see them. They stayed at our house for dinner. After dinner, we watched TV. I was tired on Sunday night. I went to bed early. David 阅读短文,判断正( T)误( F): ( ) stayed at home on Saturday morning. ( ) is Gary ’s sister. ( ) Saturday evening David and his family went to the movies. ( ) cleaned his room on Sunday morning. ( ) went to visit his grandparents on Sunday evening. B My friend has a police dog called Jack. Police dogs are often clever. Every Sunday afternoon my friend takes Jack for a walk in the park. Jack likes walks very much. It’s Sunday afternoon. A young man es to visit my friend. He stays for a long time. He talks and talks. Soon it is time for my friend to take Jack for his walk. But the visitor still(仍旧) sta is worried about(担心) his walk in the park. He walks around the room and then sits down in front of the visitor and looks at him. But the visitor goes on (继续) talking. At last Jack can’t stand it. He goes out of the room and es back a few minutes later. He sits d。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。