鲁教版英语九年级单元测试-unit6内容摘要:

as very surprised. “That‟s not a pleasant job. Why do you want to bee a garbage collector?” “Because then I‟d only have to work one day a week,” John answered. “Only one day a week?” his mother said, “What do you mean?” “Well,” John answered, “I know that the ones who e to our house only work on Wednesday, because I only saw them on that day.” 1. John_______ at school. A. didn‟t do any work B. did much work C. did very little work D. tried to finish his work 2. John‟s parents wanted him to bee_______. A. a garbage collector B. a doctor C. a teacher D. a worker 3. John hoped to be a garbage collector because________. A. he knew it was an important and necessary job B. he thought he would work only one day a week C. he often saw some garbage collectors e to his house D. the garbage collectors really work only one day a week 4. John thought that the garbage collectors only work one day a week because _______. A. it was a rule B. some garbage collectors told him so C. his parents told him so D. he saw them work only on Wednesday (二) 根据短文内容,回答下列问题。 The clock struck(敲) eight, but I was still on the bed. I could hear it was blowing strongly. “It must be windy outside, ” I thought. I came to the small town a week ago. I sold some clothes to a shop. Christmas was ing and I hoped to buy some presents for my family and friends. So I tried to meet the manager and ask him。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。