牛津译林版中考英语二轮复习介词专项训练内容摘要:

as breakfast _____ home. A. at B. in C. from D. on 22. The students are having an English lesson _____ their classroom. A. for B. in C. on D. of 23. We had a wonderful party _______ the park last night. A. to B. in C. on D. of 24. Chinese tigers live ______ the South of China. A. to B. with C. in D. at 25. Mr. Smith lives ______ that building. His house is ______ the fifth floor. A. of。 to B. in。 on C. to。 at D. on。 in 26. There’ s a concert ______ the open air in Central Park. Would you like to go with me? Yes, I’ d like to. A. in B. at C. of D. to 27. I’ m going to lie ______ bed all the weekend. Really? I prefer lying ______ the beach. A. to。 on B. in。 on C. with。 in D. in。 at 28. Where’ s our library? It’ s _____ the right side of the teacher’ s office. A. at B. in C. for D. on 29. There are some nice pictures _____ the wall. A. to B. with C. on D. at 30. Sally is very happy. There is a big smile _____ her face. A. to B. on C. in D. at 31. The monkey can stand ______ two feet for twenty minutes. A. in。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。