牛津深圳版英语八下chapter6theadventuresoftomsawyer同步练习内容摘要:

9 . I am the only one ______ can do it right. A. which B. who C. that D. whom 10. He was reading a book _____he had bought from London. A. what B. who C. which D. when 11. I ___him to work hard and to try for the exam. He looked confident again. A. encouraged B. made C. let D. forced. 12. After he had finished ____the text, he went on _____the housework. A. reading, doing B. to read, doing C. to read, to do D. reading , to do classroom is five metres ____ and four metres ____. A. wide, length B. width, long C. height, length D. long, wide 14. The students all came into the lab____some books _。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。