牛津上海版深圳五下unit10greatinventions练习题1含答案内容摘要:

to, invent(. ) 4. going, invent, what, are, you, to(?) 5. sky, watching, are, they, birds, some, in, flying, the(. ) ,选择适当的句子。 ( ) 1. A. I think paper is a great invention. B. I think the plane is a great invention. C. I think the telephone is a great invention ( ). I’m going to invent something. B. I’m going to the UK by plane. C. I’m。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。