浙江省瑞安市滨江中学20xx-20xx学年七年级英语第一学期期中试卷人教新目标版内容摘要:
Michael is an English boy. He is a good student. He is twelve years old. Now he is in a red coat. Linda is Michael’s sister. She is a nice girl. She is fourteen years old. Now she is in a green dress. Lucy and Lily are from the USA. They are students, too. They are in yellow coats. They look the same. Michael, Linda, Lucy and Lily are good friends. Michael, Lucy and Lily are in the same school. But Linda is not in the school. They like China. ( ) 41. Michael is from ____. A. the USA. B. England C. China D. Japan ( ) 42. Linda is ____. A. Lucy’s sister B. Lily’s sister C. Michael’s sister D. Michael’s mom ( ) 43. Linda is in ____. A. a red dress B. a red coat C. a green dress D. a green coat ( ) 44. Lucy and Lily are ____. A. in the same school B. in the same class C. in different schools D. in different colors ( ) 45. Michael, Linda, Lucy and Lily are ____. A. good teachers B. good sisters C. good classmates D. good friends C Dear Eric, How are you? This is a picture of my room. You can see a nice puter on my desk. It is my birthday present(生日礼物 ) from my uncle. A tape player is next to (紧按着 ) the puter, and some tapes are on the puter. My schoolbag is on the chair. My pencilbox and two books are in the schoolbag. And you can see a set of keys in the schoolbag, too. My bed is blue, and my green quilt is on it. Under the bed, you can see a baseball, and I can play it well. My books are in the bookcase, and my white model plane is in it, too. My room is tidy, isn’t it? Do you have a room? Can I have a picture of your room? Yours, Liu Peng ( )46. Who is the puter from? A. Liu Peng’s father B. Liu Peng’s uncle C. Eric’s uncle D. Eric’s father ( )47. What is on the puter? A. A tape player. B. A puter game C. Some tapes D. Some books ( )48. What isn’t in the schoolbag? A. A notebook B. A pencilbox C. Two books D. A set of keys ( )49. Which of the following is TRUE? A. The tape player is on the puter. B. The schoolbag is under the chair. C. The bed is green D. A baseball is under the bed. ( ) is the article (文章 ) about? A. A picture of Eric’s room. B. A picture of Liu Ping’s room C. A picture of Eric D. A picture of Liu Peng. 第 Ⅱ 卷 五、词汇运用(共 15分) 根据句子意思,用括号中所给汉语提示或英语单词的适当形式填空。 A. 根据短文内容,用所给单词的适当形式填空。 (每空一词) you , be, on, a, box, 51. I have ________ aunt. H er name is Mary. 52. The _______ are red. They are。浙江省瑞安市滨江中学20xx-20xx学年七年级英语第一学期期中试卷人教新目标版
相关推荐
容器中的 可逆 反应: N2( g) +3H2( g) ⇌ 2NH3( g), 400℃ , 30MPa下 n( NH3)和 n( H2)随时间变化的关系如图所示.下列叙述正确的是 A.点 a 的正反应速率比点 b的大 B.点 c 处反应达到平衡 C.点 d( t1时刻)和点 e( t2时刻)处 n( N2)不一样 D.点 d( t1时刻) 3v 正 ( H2) = v 逆 ( N2)
③ 规范权力行使,提高行政管理水平 ④ 推动依法行政,引领民主法制建设 A. ①② B. ①③ C. ②④ D. ③④ 【答案】 D 【解析】 本题考查依法行政的意义。 题干强调对行政权力的规范, ③④ 正确地表明了对行政权力进行规范的意义。 题干不涉及行政法规的健全, ① 不合题意。 ②中的 “ 削减 ” 说法错误。 故答案选 D。 22. 人民代表大会制度是我国的根本政治制度
2、 倍液。 苹果轮纹病、炭疽病的防治苹果轮纹病一般在 5 月中旬开始侵染果实,而炭疽病要到 6 月上旬开始发病,两种病害可一起防治。 春季清扫枯枝落叶,刮除树上粗皮。 加强综合治理,增强树势,提高抗病力。 春季萌芽前打一遍铲除剂,生产中使用机福乐合剂效果良好。 机福乐合剂的配制方法是 100 倍机油乳剂+5080 倍福美胂+10001200 倍氧化乐果。 配制时可一块配制,如 50 千克水加上
,母亲便去仓房找了三双半新的棉鞋,还有半面袋的冻豆包回来,递给这个年轻人说:“我们也不是有钱人家,要不然,就把你这丝棉买下了。 这双棉鞋你换上,另两双拿去给你父亲和弟弟穿,北方不比南方,脚冻伤了可了不得。 冻豆包我们今年蒸得多,你带几个让你的父亲和弟弟尝尝吧。 ”年轻人站了起来,拘谨地搓着手,一遍遍地说:“这可咋好呢。 这可咋好呢。 我这是遇上好人家了。 ” ⑦我们把他送出门时
璃管液面上升高度 h 甲 ________(选填 “ 大于 ” 或 “ 小于 ” )乙玻璃管液面上升高度 h乙。 断开开关,当两根玻璃管液面回到原来高度后,向右移动滑片,再闭合开关,则甲玻璃管液面上升高度 h 甲 所需时间 t2___________(选填 “ 大于 ” 或 “ 小于 ”) t 1。 【答案】大于 大于 【解析】 考点:焦耳定律 9.如图是凸透镜成像的实验,图 图