新冀教版八年级上册unit4综合测试卷内容摘要:
ch. She wanted very much to try a new way of cooking a fish dish, and she was very pleased with herself when the dish was ready. The dish was very hot, so she put it near the open window to cool it. But five minutes later, when she came back for it. She was surprised to see her neighbour’s cat, Mike, at the dish. She was in time to stop the cat before it was too late. That afternoon everything was good and all her friends liked the fish very much. They talked and laughed until four o’clock. Then they said goodbye and left. At the end of that afternoon, when she was alone again, Mrs. Jackson was very tired but happy. She was sitting in the chair just near the window. Through the window, she was surprised to find her neighbour’s cat dead in the garden! Why? The fish must be bad! What would happen to her friends? She at once telephoned her family doctor. The doctor told her to telephone each of her friends to see him at the hospital. At last, the danger was over. Once again, Mrs. Jackson was alone in her chair in the sittingroom, still tired but no longer happy. Just then the telephone rang. It was her neighbour. “Oh, Mrs. Jackson, Mike is dead. He was killed by a car and put in your garden ...” ( )1. Why did Mrs. Jackson put the fish near the open window? A. Because she didn’t cook the fish well. B. Because she wanted to give the fish to the cat. C. Because she wanted to show how delicious the fish was. D. Because she wanted to cool the hot fish. ( )2. Who was Mike? A. Mrs. Jackson’s son. B. Mrs. Jackson’s neighbour. C. A cat. D. Mrs. Jackson’s father. ( )3. How did Mrs. Jackson feel when she saw the dead cat? A. Angry. B. Frightened. C. Surprised. D. Happy. ( )4. Put the following events that happened in order. ① Mrs. Jackson telephoned her doctor. ② Mrs. Jackson cooked the fish in a new way. ③ Her friends saw the doctor. ④ Mrs. Jackson saw the dead cat. A. ②③④① B.。新冀教版八年级上册unit4综合测试卷
相关推荐
)当气温 x=15 186。 C时,声音的速度 y= m/s. ( 2)当气温 x=22 186。 C时,某人看到烟花燃放 5s后才听到声音响,则此人与燃放的烟花所在地相距 m 拖拉机工作时,油箱中的余油量 Q (升)与工作时间 t (时)的关系式为 40 6Qt.当4t 时, Q _________,从关系式可知道这台拖拉机最多可工作 _________小时. 一个长方形周长为 12
分叶具有 叶柄 、 叶片 结构, 叶片上还有叶脉。 三 、 观察叶的生命特征 观察: 比较新鲜的叶与落叶,它们有什么相同和不同。 思考:长在树上的新鲜叶与落叶的最大的不同表现在哪里。 是呀,新鲜的叶是活的,而落叶是死的。 描述: 观察一种植物的叶,我们能从中看出叶的生长变化过程吗。 能找到这条树枝上有几种不同的生长阶段的树叶吗。 (如 叶芽、小叶片、嫩叶、成熟的叶、老叶
考号 考场 45 比 48 少得多。 ( ) 三、 我会选。 ( 10 分) 在 46这个数中,“ 4”表示 4( ) ① .一 ② .十 ③ .百 比 50小的数是( ) ① .48 ② .53 ③ .60 奶奶今年 60岁,爷爷的岁数和奶奶差不多。 爷爷的岁数可能是( ) ① .49 ② .62 ③ .80 图中有( )个正方形。 一件上衣 82元,付给售货员 100 元,应找回( )元。
= m/s. ( 2)当气温 x=22 186。 C时,某人看到烟花燃放 5s后才听到声音响,则此人与燃放的烟花所在地相距 m 拖拉机工作时,油箱中的余油量 Q (升)与工作时间 t (时)的关系式为 40 6Qt.当4t 时, Q _________,从关系式可知道这台拖拉机最多可工作 _________小时. 一个长方形周长为 12,一边长为 x ,面积 y 随 x 的变化而变化,则
事例一:我国某海岛的天然林覆盖率在 1965 年为 %, 1974 年为 %, 1981 年仅为%,并且因遮盖地面程度大大降低,从而导致了坡垒等珍稀树种濒临灭绝,裸实等珍贵药用的植物已经绝迹。 事例二:我国西北某县野生甘草面积在 1967年为 4 万多公顷, 30年后己有一半被挖尽,另外我国的野马已经绝迹,野骆驼等野生物种也濒临灭绝。 事例三:一种原产日本的林业害虫,于 20 世纪
形, CF=15 cm,求△ OCD 的周长 . 【拓展延伸】 9.(9 分 )如图 ,∠ AOB=30176。 ,角内有一点 P,PO=10 cm,两边上各有一点 Q,R(均不同于点 O),则△ PQR 的周长的最小值是多少 ? 答案解析 1.【解析】选 C. 轴对称图形是沿某 条直线折叠后,直线两旁能够完全重合的图形,只有选项 C 是轴对称图形 . 2.【解析】选 选项沿着直线 L 折叠