山东省龙口市诸由观镇诸由中学八年级英语上册unit8whydon’tyougetherascart单元综合测试鲁教版内容摘要:

ord? — Yes. I have made the word _______. A. to look up , look up B. to look up , looked C. look up , to be looked up D. look up , looked up 五、完形填空。 A Once Einstein gave a lecture in many places in America. His driver always listened to him and knew the lecture so well that he was sure he could give it himself. So Einstein agreed that the driver gave the lecture for him. As nobody knew Einstein there, the driver gave the lecture for Einstein that evening. At first he was a bit afraid, but Einstein39。 s smile made him feel better. He gave a good lecture and the people were quite pleased. Then the driver started to leave and Einstein followed him without a word. When they got to the door, a man asked the driver a difficult question. The driver said that the question was very easy, and told the man to ask his driver behind to answer it. 根据短文内容填空 , 每空限填一词 Einstein gave the (1) _______ lecture again and again. His driver (2) _______ to his lecture so many times (3) _________ he wanted to give it (4)_______. When Einstein knew it, he let the driver (5) ________ the lecture for him that night. The driver gave a (6) ________ lecture and the great scientist was quite pleased. When they were (7) ________ the lecture room, a man asked the driver a question. To show (8) __________ easy the question was, the driver asked Einstein who followed him (9) ________ to answer it (10) ________ of him. B 对话填空,在对话空白处填上一个合适的词,使对话意思完整( 10分) A: Wow! (1) a beautiful album! Whose is this? B:( 2) it is your daughter’ s. She likes to collect beautiful things. A: No. It( 3) be hers. She likes to collect cards but not album. B: Look! There’ s a card (4) it. A: Where? Let me have a(5) .“ Dear mum, today is your(6) .Happy birthday(7) you! Your daughter, Mary!” Oh, dear! Today is my birthday! I (8) it. B: Really? Happy birthday to you! A: (9) you! I’ m very(10) today. 六、阅读理解。 A I’m taking my family to other countries to have a trip. My wife and I and our two children are all going along. My elder brother will go with us, too. He has never been ov。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。