山东省龙口市诸由观镇诸由中学八年级英语上册unit3whatwereyoudoing学案鲁教版内容摘要:

the lake. C. He jumped into the river and saved the girl. 参考 答案: : What were you doing : How about you : reading a novel/story : b : c : a ● Exercises for grammar(语法专练) Ⅴ .Fill in the blank with the right word form.(用所给动词的正确形式填空。 ) 1. I __________ (get) ready for supper at five last Sunday. 2. The story__________ (happen) in June, 1919. 3. __________they__________ (shop) when you met them? 4. The train usually __________ (leave) the station at ten o’clock in the morning. 5. Stop__________ (read) and__________ (listen) to me carefully. 6. We think the boy__________(be) a good singer in the future. 参考答案: : was getting at five last Sunday 是过去进行时的时间状语。 : happened in June,1919 用过去时; happen不用被动语态。 : Were。 shopping 本句意为“当你碰到他们的时候,他们正在购物吗。 ” : leaves usually 是一般现在时的时间状语。 : reading。 listen stop doing “停止做某事”。 并列连词 and连接两个并列的动词,前面是动词原形 stop,所以第二个空也应用动词原形。 : will be in the future 是一般将来时的时间状语。 再接再厉 (课后巩固类训 练) ● Elementary exercises(基础题) Ⅰ .Draw lines to match the dialogue.(把下列对话用线连起来。 ) Ⅰ 1. What was Jimmy doing when the UFO arrived? 2. When did it happen? 3. What happened after that? 4. Were the girls scared? 5. How often do the aliens e? Ⅱ A. Well, next, they played with the children. B. They visit every summer. C. No, they thought it was funny. D. Last nigh。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。