外研版八上module2unit3languageinuse同步测试内容摘要:

eet Jay Zhou. 25. 这女孩乘飞机到过全中国吗。 _____ the girl ______ ______ ______ China _____ plane? Mr. Jackson began his trip last Saturday. Two days later when he was traveling in the country 26______, he saw a dog behind a man. As the car came near them, the dog „suddenly started to 27_______ the road. Of course the car hit the poor animal and killed it. Mr. Jackson 28______ his car and walked to the man. “I‟m very 29______ that this happened.” he said. “How much shall I 30______? Will ten dollars be enough?” “Oh, yes.” said the man. “Ten dollars will be 31______ enough.” Mr. Jackson put his hand into his pocket, but he only 32______ five dollars in the pocket. “Sorry, sir, I‟ve only 33_______five dollars.” Said Mr. Jackson. “No problem. That‟s enough.” the fat man replied. “Thanks a lot. That‟s very kind of you.” Mr. Jackson thanked the fat man and 34______ away. When the car went away, the fat man looked down at the dog and thought. “I want to know 35______ dog it is.” 26. A. by bus B. by bike C. by train D. by car 27. A. go B. cross C. run D. jump 28. A. started B. ran C. stopped D. jumped 29. A. sad B. lucky C. sorry D. pleased 30. A. give B. take C. bring D. pay 31. A. quite B. very C. m。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。