外研版九上module3sportinglife模块测试题内容摘要:

ght tickets.” 6. Joe and his family decided to go to the cinema because _________. A. they enjoyed seeing films in a small town B. it was impossible for Joe and his team to have a football match that afternoon C. they wanted to try something new for a change D. nothing else could interest them on a rainy afternoon 7. When Joe and his family got to the cinema __________. A. all the tickets had been sold out B. the film had been on for quite some time C. people in the cinema were waiting anxiously (焦急地 ) D. everyone in the cinema was clapping 8. How did Joe feel when he was given such a warm wele? A. He felt surprised B. He felt worried C. He felt proud D. He felt both surprised and proud 9. How many children did Joe have? A. At least one B. At least two C. At least three D. At least five 10. Why did the people in the cinema wele Joe and his family so warmly? A. Because he was the coach of a football team B. Because he and his family were newers in the small town C. Because they had seen Joe’s games on TV D. Because they could not see the film until enough people had arrived (C) A young woman was driving through the country far away from the town. It was dark and raining. Suddenly she saw an old woman by the side of the road, holding her hand out as if (好像 ) she wanted a lift “I can’t leave her out in this weather,” the woman said to herself, so she stopped the car and opened the door. “Do you want a lift?” she asked. The old woman nodded (点头 ) and climbed into the car. After a while, she said to the old woman, “Have you been waiting for a long time?” The old woman moved her head from side to side. “Strange,” thought the young woman. She tried again. “Bad weather for the time of year,” she said. The old woman nodded. No matter what the young woman said, the hitchhiker (搭便车的人 ) gave no answer except for a nod of the head. Then the young woman noticed the hitchhiker’s hands, which were large and hairy. Suddenly she realized the hitchhiker was in fact a man! She stopped the car. “There is something wrong with the car,” she said, “Would you mind getting off and helping me?” The hitchhiker nodded and opened the door. As soon as the hitchhiker was out of the car, the frightened young woman raced off. When she got to the next village she stopped her car. She noticed that the hitchhiker had left his handbag behind. She picked it up and opened it. To her surprise, there was a gun (枪 ) inside the bag. 11. The woman stopped her car because _____. A. the old woman was very strange B. she knew the old woman very well C. she knew where the old woman lived D. she wanted to help the old woman out 12. The word “lift” in the passage means _____. A. an act of raising something B. a ride in the car C. an offer of cleaning cars D. something run by electricity 13. What made the young woman feel strange about the “old woman”? A. The fact that the “old woman” kept nodding her head. B. The fact that the “old woman” was unable to speak C. The fact that the “old woman” gave no answer to her questions. D. The fact that the “old woman” had large and hairy hands. 14. The young woman asked the hitchhiker to get off the car because ______. A. this was the way she thought of to get rid of (摆脱 ) him B. there was something wrong with her car C. the hitchhiker had a gun in his handbag D. the hitchhiker knew how to drive her car 15. The hitchhiker left the bag with gun in it behind because ______. A. it was his present for riding the young woman’s car B. he didn’t expect (料想 ) the woman would drive。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。