北师大版英语九年unit5englishandenglish-speakingcountries同步测试内容摘要:

playing the violin. On the night of the party Merlin rolled into the room playing his violin. Everyone was very surprised to see him. There was just one problem. Merlin had no way to stop his roller、 skates. He rolled on and on. Suddenly, he ran into a huge minor that was hanging on the wall. The mirror fell down, breaking into pieces. Merlin’s idea was so good that nobody fet his special entrance for a long time. But could he find out a way to stop his roller skates? ( )1. The passage is mainly about________ . A. a careless man B. a wonderful dream C. the birth of roller skates D. the birth of violins ( )2. People thought Merlin was a dreamer because he________ . A. dreamed day and night B. 1iked making th ings C. was an interesting man D. was full of strange ideas ( )3. Merlin wanted to________, so he put wheels under his shoes. A. play the violin well B. arrive at the party sooner C. be taller than the others D. surprise the people at the party ( )4. What did the writer want to tell us in the last paragraph? A. Merlin made a lot of trouble. B. Roller skates should be improved. C. The people were angry with Merlin.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。