冀教版初中英语八年级上册单元测试-unit4内容摘要:
w many C. How old D. How 8. A. no B. not C. too D. isn’t 9. A. give B. let C. have D. make 10. A. can B. can’t C. are D. aren’t Ⅳ .阅读理解。 ( 20 分) A One day Mr. Robinson saw a woman in the street with ten children. He was very surprised because all the children were wearing the same clothes—white hats, blue coats and white pants. “ Are all those children yours? ” he asked the woman. “ Yes, they are,” she answered. “ Do you always dress them in the same clothes?” asked Mr. Robinson. “ Yes ,” answered the mother,“ When we had only four children, we dressed them in the same clothes because we didn’t want to lose any of them. It was easy to see our children when they were among (在 …… 中间 )others because they were all wearing the same clothes. And now, when we have ten, we dress them like this because we do not want to take other children home by mistake(错误 ) .When there are other children among ours, it is easy to see them because their clothes are different.” 根据短文内容 ,选择正确答案。 1. One day ______. A. Mr. Robinson met a woman teacher with 10 school children B. Mr. Robinson met 10 children with their moth er C. the mother met Mr. Robinson with 10 school children D. the mother met Mr. Robinson with his 10 children 2. - Why was Mr. Robinson surprised when he saw the ten children? - Because he saw that______. A. they all had the same look。冀教版初中英语八年级上册单元测试-unit4
相关推荐
二、问答题 6.( 1)孔子的思想核心是什么。 ( 2)孔子在教育上有什么成就 ( 3) 孔子在史学上有什么成就。 ( 4)孔子的学说在中国文化史上有什么影响。 7.战国时期 ,出现了百家争鸣的局面。 结合所学知识,回答下列问题。 ( 1)百家争鸣出现的原因是什么。 ( 2)百家争鸣中主要有哪些学派
other ( ) 16. My friend lives in a village ____ Plum tree. A. name B. named C. call D. calling ( ) 17. I like music, and I _____ like sports. A. too B. also C. either D. don’t ( ) 18. It’ s getting
下列王朝中,其统治与西晋最相似的是 ( ) A夏朝 B 西周 C秦朝 D西汉 2江南地区得到开发的表现不包括 ( ) A修建水 利工程,荒地变成良田 B江南种植水稻,稻田使用绿肥 C牛耕和粪肥也得到推广 D福建、广东等地还未得到开发 二、组合列举题 2写出下列历史事件的时间 ( 1)西晋建立和灭亡: ( 2)“八王之乱”: ( 3)东晋建立: ( 4)氐族在建立前秦: ( 5)淝水之战: (
the whole trip. ( )1. A. by bus B. by ship C. by train D. by air ( )2. A. found out B. found C. looked for D. looked ( )3. A. only B. on C. except D. to ( )4. A. sat B. taken C. put D. seen ( )5. A.
1、末夏初是栽培平菇的好季节。 但是,有些菇农由于操作不当,使菌棒出菇后变黄坏死、培养料变酸发臭、菌丝长满袋后迟迟不出菇等异常现象,使成功率、产量、质量均有所下降,直接影响经济效益。 笔者根据多年的生产实践和群众经验,现将其异常现象原因及处理措施小结如下。 一、菌袋出菇后小菇大批死亡春末夏初,有时菌棒出菇后,小菇大批变黄发软,基部变粗,继而枯萎腐烂成为死菇。 原因:一是桑椹原基形成后
nurse B. captain C. hijacker D. passengers 7. A. helped B. shouted at C. shot D. attacked 8. A. stopped B. killed C. shot D. helped 9. A. taken B. flown C. brought D. carried 10. A. captain B.