仁爱湘教版初中英语八年级上册期末测试题一内容摘要:

puter today 18:30 Children’s programs 18:10 Foreign arts 19:00 News 18:30 English classroom 19:30 Weather report 19:00 Animal world 19:40 Around the world 19:25 News Express 20:10 TV play: Struggle 20:20 Sports 21:00 English for today 20:50 Movie: Transformers 21:15 Pop music 22:45 English news 21:55 Talk show 23:05 On TY next week 根据材料内容选择最佳答案。 ( )51. If you want to know something about Japan, you should see ______. A. Weather report B. News Express C. Around the world D. Animal word ( )52. If you are a basketball fan, you may watch TV at ______. A. 19:00 on Channel 2 B. 19:40 on Channel 1 C. 20:20 on Channel 2 D. 21:15 on Channel 1 ( )53. How long does the movie Transformers last? A. 45 minutes. B. 95 minutes. C. 115 minutes. D. 120 minutes. ( )54. If you are going to Qingdao tomorrow, you’d better watch the program of ______. A. Weather report B. Talk show C. Foreign arts D. News Express ( )55. You can watch ______ program(s) if you want to learn English on TV. A. English news B. English classroom C. English for today D. all the above C A young man was walking through the street one day and he was very thirsty. Finally he went into a shop and asked the shopkeeper, “How much are these cakes you have here?” “Five cents each,” was the answer. “I’ll give you ten cents for three of them.” “All right,” said the shopkeeper. So the young man took three cakes and then began looking at some other things in the shop. “How much is this wine?” he asked. “Ten cents a glass.” “Well, I’m more thirsty than hungry. Please take back the cakes and give me a glass of wine.” So the shopkeeper gave him a glass of wine. The young man drank the wine and began to walk out of the shop. “Just a minute, young man,” said the shopkeeper. “You didn’t pay for the wine.” “Of course not, I gave you the cakes for it.” “But you didn’t pay for the cakes.” “I didn’t eat them. I gave them back to you. I certainly don’t have to pay for anything I didn’t eat, do I?” And before the shopkeeper could think of an answer to that, the young man was out of the shop. 根据材料内容选择最佳答案。 ( )56. The young man went into a shop because ______. A. he was thirsty B. he was hungry C. he was tired D. he wanted to ask the way ( )57. What’s the meaning of the phrase “Just a minute” in Chinese? A. 一分钟 B. 仅仅一分钟 C. 正好一分钟 D. 等一下 ( )58. Which of the following did the young man get at last? A. Two cakes. B. Three cakes. C. A glass of wine. D. A cake and a glass of wine. ( )59. How much did the young man pay at last? A. Five cents. B. Ten cents. C. Fifteen cents. D. Nothing. ( )60. Which of the following is TRUE? A. The young man walked through the street to a shop.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。